Spl Repairs To External Near Bldg No P-10 And P-20 Ataltinho Of Hq 2 Stc And Provn Of Drainage And Pumpingsystem For Rainwater Harvesting Sump Utilization Ataltinho And Rainwater Sump In Bambolim Area Under Gepanaji
As Per Tender Documents Provn Of Water Storage Tank And Rain Water Harvesting Pit And Shed With Hardstanding Near Bldg No.t-1 And Spl Rep In Bldg No. P-25, P-27/1 And P-37/02 Hanger Of 665 Army Avn Sqn R And O
Repair/maint/development Of Borewells And Rain Water Harvesting System Centrifugal Pumps Submersible Pumps Monoblock Pumps/starter And Connected Items In Water Supply Installation At Shankar Vihar Area Rangpuri And Connected Area Of Ageu Water Supp
Contractor Registration And Annual Rate Determination For Implementing The Rainwater Harvesting Scheme By Digging Boreholes, Erecting Hand Pumps And Constructing Bunds And Related Works 115/150 Mm Diameter Boreholes And Refilling Boreholes Through
Up-Gradation And Renovation Of Rain Water Harvesting System On Roof Top Area Of Coal Testing Lab, Vtc, Wtp, Rescue Station And Hospital Building Area Of New Majri Sub Area Of Majri Area.
2 Construction Of Roof Top Rain Water Harvesting Stucture 10 Gp Suwaniya, Chogawadi, Gowliya Block Gangrar District Chittorgarh
1 Construction Of Roof Top Rain Water Harvesting Stucture 11, Recharge Shafr4 Gp Gilund, Ghatiyawali Block And District Chittorgarh
Development Of Water Harvesting Reservoir Renovation Of Pond At Prawn Unit, Icar- Cifa, Kausalyaganga, Bhubaneswar Cifa/Works/Efc/Water Harvesting/2025-26
Construction Of Rooftop Water Harvesting Structure 06 Block Neemrana District Kotputli-Behror Mjsa 2.00 Phase 01
Construction Of Rooftop Water Harvesting Structure 03 Block Bansur District Kotputli-Behror Mjsa 2.00 Phase 01