Supply Of Ev-Three-Wheeler With Tipper/Hopper
Supply & Loading Into Railway Wagons/ Hoppers And Unloading The Same 96112 Cum Of 50 Mm Size Machine Crushed Hard Stone Track Ballast At Bakudih/ Rajgram /pinargaria Quarry Siding For The Jurisdiction Of Ranchi Division (measurement Will Be Done At Destination).
Supply & Loading Into Railway Wagons/ Hoppers And Unloading The Same 100018 Cum Of 50 Mm Size Machine Crushed Hard Stone Track Ballast At Pakur/ Taljhari/ Barharwa Quarry Siding For The Jurisdiction Of Ranchi Division (measurement Will Be Done At Destination).
Bharatpur Depot:- Supplying Of 46761 Cum. 65mm. Size Machine Crushed Stone Ballast Of Approved Quality And Loading Into Hoppers/ Wagon At (for Balance Quantity).
Supplying And Stacking Of Ballast At Sindhudurg Ballast Depot, Loading Into Krcl Hoppers, Unloading, Spreading And Boxing Of Ballast In The Jurisdiction Of Senior Regional Engineer, Ratnagiri And Senior Regional Engineer, Karwar. (rate Quoted Shall Be Excluding Gst. Gst Shall Be Payable As Applicable). Computer No.67412.
Work Of Replacement Of Non-Functional Esp Hopper Heaters At Unit 3, Kltps
Ttps Mech Ii Ahp Unit Ii Breakdown Maintenance Of Eco Aph Hoppers Ash Disposal System For The Period From 01 04 2026 To 31 03 2027
Ttps Mech Ii Ahp Unit I Breakdown Maintenance Of Eco Aph Hoppers Ash Disposal System For The Period From 01 04 2026 To 31 03 2027
Cleaning And Clearing The Spilled Red Hot Bottom Ash From Drycon Screw Conveyor Surrounding Bottom Ash Hoppers Area And Crusher House Area Transporting The Ash To Upper Ash Dyke By Using The Contractors Vehicles Of Jcb And Tractors Ot 216 Red Hot
Removal Of Settled Ash Clinker In Unit Ii Iii Common Trench From Bottom Ash Hopper To Ash Handling Pump House And Interconnection Tunnel