Supply, Installation, Testing & Commissioning Of Automated Hydraulic System For Pinion Mounting And Extraction For Three Phase Traction Motors.: 24 Months After The Date Of Delivery
Supply Of Hydraulic System For Pinion Mounting & Extraction As Per Clws Specification..
Supply of Supply, Installation & Commissioning Of 2500 Bar High Pressure Hydraulic System For Pinion Mounting And Extraction Tools For 3 Phase Traction Motor As Per Attached Specification Annexure A Includin G Standard Accessories. Warranty Period: 30 Months After The Date Of Delivery
Supply, Installation, Training, Testing And Commissioning Of Automated High Pressure Hydraulic System For Pinion Mounting And Extraction For Three Phase Loco Traction Motors As Per Cofmow Spec No. Cofmow/Hpspmae/2021Rev.0 Or Latest, Capacity - 2500 Bar With Concomitant Ac Cessories And Essential Spares. Warranty Period: 30 Months After The Date Of Delivery
Supply Installation & Commissioning Of 2500 Bars High Pressure Hydraulic System For Pinion Mounting & Extraction For 3 Phase Traction Motor As Per Els/Ajj Technical Specification.Technical Specificati On And Special Condition Of M&P With Amc Enclosed.Make :- Hypress Or Orion Or Crimpwell Or Tecalto Or Skf Only. Note:-Includes Supply, Installation, Testing, Commissioning & Demonstration At Els/Ajj. Warranty P Eriod: 24 Months After The Date Of Delivery Annual Maintenance Contract For Supply Installation & Commissioning Of 2500 Bars High Pressure Hydraulic System For Pinion Mounting & Extraction For 3 Phase Traction Motor. I Suppliers Are Req Uired To Quote For The Post Warranty Annual Maintenance Contract Amc For A Period Of 5 Years After Expiry Of The 2 Years Warranty Period Of The M&P Along With Their Offers. The Scope Of Amc Will Include Preventive And Breakdown Maintenance. Amc Charges Will Include All Cost Of Personnel, Spares Etc. Except The Cost Of Consumables Required For Day To Day Operation & Daily Maintenance Checks. Ii During Amc, Firm Should Att End The Equipment Within 7 Days After Receipt Of Written Letter/Notice For Carrying Maintenance And The Equi Pment Down Time For Each Maintenance Activity Shall Not To More Than 48 Hrs. Iii The Supplier Shall Quote Amc Rates For Each Of The Five Years. The Amc Charges Would Be Added To The For Destination Price Quoted For M&P For The Purpose Of Comparative Evaluation Of Offer. In Order To Equality Compare Different Amc Char Ges For Different Years. The Concept Of Npv Net Present Value May Be Used At A Pre - Determined Rate Of Di Scounting To Bring The Amc Charges At The Same Footing In The Assessment Of For Destination Price. Iv Th E Post- Amc Maintenance Of Machines Will Be Dealt With By End Users. In Order To Facilitate The Same, Suppli Ers Are Required To Give The Current Cost Of Spares Required For Maintenance Of Machine After Amc Period An D The Current Service Charges For Each Items Of Work Of Repair Of M&P Beyond The Amc Period. V Supplier, Who Is Oem Must Give Undertaking For Supply Of Spare Parts For A Period Of Expected Life Of The Machine/Eq Uipment. Ohter Suppliers Must Submit Undertaking From Oem From Supply Of Spare Parts For Period Of Expec Ted Life Of The Machine/Equipment. Vi The Supplier Shall Quote Separately The Amc Charges. Note: Firms T O Quote Separately I.E Year 1 Tab For 3Rd Year, Year 2 Tab For 4Th Year, Year 3 Tab For 5Th Year, Year 4 Tab For 6Th Year, Year 5 Tab For 7Th Year. Warranty Period: 2 Years, Amc Period: 5 Years, Rate Of Discounting: 10 %
Supply of Ss Elbow Adaptor Suitable For Gem Pressure System India Pvt. Ltd. Hydraulic System Pinion Mounting And Extraction Machine For 3 Phase Traction Motor, Model No: Gps/09-19/601. Note: 1 One Sam Ple To Be Got Approved From Consignee Before Bulk Supply. 2 Material Should Be Suitable For 3000 Bar Pre Ssure. Warranty Period: 30 Months After The Date Of Delivery Quantity Tolerance +/-: 5 %Age, Item Category : Normal, Total Po Value Variation Permitted: Max 8 Lacs
Supply of Design, Manufacture, Supply, Installation, Training, Testing And Commissioning Of Automated High P Ressure Hydraulic System For Pinion Mounting And Extraction For Three Phase Loco Traction Motors As Per Cof Mow Spec No. Cofmow/Hpspmae/2021Rev.0 Or Latest, Capacity - 2500 Bar With Concomitant Accessori Es And Essential Spares. Warranty Period: 30 Months After The Date Of Delivery
Supply of Set Of Spare Suitable For Gem Make Air Operated Hydraulic System For Pinion Mounting And Extraction System Mfg:Gem Pressure System-Hydrabad, Machine No. 2019- 980 & Mfg. No: Gps/09-19/601. One Set Consisting Of 03 Items 20 Nos. 1 Ss Elbow Adaptor Connecting Pipe With Gland Nut And Sleev From Qrc To Pinion Adaptor Suitable For 3100 Bar Pressure. Qty: 12 Nos/Set. 2 Ss Body Hp Pressure Guages Glycerin Filled For 3000 Bar. Qty: 02 Nos./Set.3 Pinion Adaptor Pinion Side Male Threads Should Be R 1/4 Inch Bspt With 1:16 Tapered For 20 Teeth Pinion Suitable For 3100 Bar Pressure. Qty:06 Nos./Set. Note: Items Should Be As Per Attached Annexure..
Supply of Set Of Spare Suitable For Gem Make Air Operated Hydraulic System For Pinion Mounting And Extraction System Mfg:Gem Pressure System-Hydrabad, Machine No. 2019- 980 & Mfg. No: Gps/09-19/601. One Set Consisting Of 03 Items 20 Nos. 1 Ss Elbow Adaptor Connecting Pipe With Gland Nut And Sleev From Qrc To Pinion Adaptor Suitable For 3100 Bar Pressure. Qty: 12 Nos/Set. 2 Ss Body Hp Pressure Guages Glycerin Filled For 3000 Bar. Qty: 02 Nos./Set.3 Pinion Adaptor Pinion Side Male Threads Should Be R 1/4 Inch Bspt With 1:16 Tapered For 20 Teeth Pinion Suitable For 3100 Bar Pressure. Qty:06 Nos./Set. Note: Items Should Be As Per Attached Annexure.. Set Of Spare Suitable For Gem Make Air Operated Hydraulic System For Pinion Mounting And Extra Ction System Mfg:Gem Pressure System-Hydrabad, Machine No. 2019- 980 & Mfg. No: Gps/09-19/601. One Set Consisting Of 03 Items 20 Nos. 1 Ss Elbow Adaptor Connecting Pipe With Gland Nut And Sleev From Qrc To Pinion Adaptor Suitable For 3100 Bar Pressure. Qty: 12 Nos/Set. 2 Ss Body Hp Pressure Guages Glyceri N Filled For 3000 Bar. Qty: 02 Nos./Set.3 Pinion Adaptor Pinion Side Male Threads Should Be R 1/4 Inch Bs Pt With 1:16 Tapered For 20 Teeth Pinion Suitable For 3100 Bar Pressure. Qty:06 Nos./Set. Note: Items Shoul D Be As Per Attached Annexure. Warranty Period: 30 Months After The Date Of Delivery
Supply of Hydraulic System For Pinion Mounting & Extraction For 3 Phase Traction For Memu Cap-2500 Bar As Per Technical Specifications Attached Below Warranty Period: 30 Months After The Date Of Delivery 5 Years Comprehensive Amc Of Hydraulic System For Pinion Mounting & Extraction For 3 Phase Tr Action Motor For Memu Cap-2500 Bar After Completion Of Warranty Period Warranty Period: 2 Years, Amc Period: 5 Years, Rate Of Discounting: 8 %