Bi-ennial Rate Contract For The Work Of Spray Insulation Of Various Turbine Modules, Valves, Heat Exchangers, Associated Pipe Lines Etc. For Aoh Of Unit No 10 Scheduled In Year 2026 And Running Maintenance Of Unit No. 10 And 11 Of Ph-iv
Arc Of Insulation Work
Mtps I Tm Unit I To Iv Attending Breakdown Maintenance Work Of Removal Of Insulation And Providing Re-Insulation To Pipe Lines And Valves Hp Heaters Gland Steam Cooler Lp Heater And Transportation Of Required Material And Disposal Of Scraps Inturbine
Work Of Punctured Insulation Detection Pid Test Of 400Kv Dhampur-Moradbad S/C Line Under 400Kv S/S Kashipur
Repair And Maintenance Of Insulation Work During Ohcu And Hgu-ii Unit Shutdown At Iocl, Refinery.
Insulation Work Of Mt Garage At Bop Of 15Th Bn Itbp An Altitude 4366 Mtr And Distance From Leh 215 Km Road Connected Bop Itbp/Shq Snr/Engr/15Th Bn/Mt Shed Rango/186/2025/10969-74 Dtd 04/11/25
Insulation Work Of Mt Garage At Bop Of 15Th Bn Itbp An Altitude 4389 Mtr And Distance From Leh 255 Km Road Connected Bop Itbp/Shq Snr/Engr/15Th Bn/Mt Shed T-Male/184/2025/10958-63 Dtd 04/11/25
Insulation Work Of Mt Garrage At Bop Of 15Th Bn Itbp An Altitude 4268 Mtr And Distance From Leh 233 Km Road Connected Bop Itbp/Shq Snr/Engr/15Th Bn/Mt Shed Dungti/185/2025/10964-68 Dtd 04/11/25
Insulation And Cladding Work With Lrb At Boiler Section
. Insulation And Lagging Work At Various Stations Of The Factory.