Parta: Provision Of Quick Watering Arrangement At Nishatpura Station Partb: Hbj-Provision Of New Over Head Tank 50 Kl And Pump House New Type-V Colony Partc: Bhopal- Providing New Pipeline From Nagar Nigam Pf No.6 Point To New Filter Plant, Staging Improvement At Kamla Park Intake Well Electrical Work
Operation And Maintenance Of Intake Works 196 Mld At Head Works Near Samanna Water Tank In Mettupalayam And 19.83 Km Length 1400mm Dia Raw Water Pumping Main From Intake Well, Mettupalayam To Water Treatment Plant At Kurukiliyampalayam Near Annur
Construction Of Temporary Bundh At Howrah River Near Intake Well Of 4 Mgd Swt Plant Bordowali Under Dws Sub Division Ii Milansangha Agartala
Maintenance Of Drinking Water Supply Schemes Of Nrdwp/rws/ffc Fund 2025-26/sh- Periodical Cleaning Of Intake Well, Mtc. Of Vt Pump Motors, Other Allied Works Etc. At Kanchanpur Swtp 0.65mgd Of Dws Sub-division Kanchanpur
Improvement Of The Existing Raw Water Channel From Mahananda River To Intake Well And Annular Space Of Intake Well, Fulbari Of Siliguri Municipal W/s Scheme Under Siliguri Water Supply Division, P.h.e Dte. Phe/swsd/ae-ii/niet-09 Of 2025-26 Sl.no. 01
Surveying, Collection Of Hydrogeological Data, Design, Detailed Engineering, Construct Ion, Supply, Installation, Testing And Commissioning Of Surface Water Based Multivillage Piped Water Supply Scheme Having 27.00 Mld And 4.00 Mld Million Liters Pe R Day Intake Well With Approach Bridge Capacity, 27.00 Mld And 4.00 Mld Million Liters Per Day Wtp Capacity, Clean Water Mgsr Master Ground Service Reservoir - 01No., Ugrunderground Reservoir- 03 Nos., Zonal Esr-23 Nos., Ms, Dik9 Pipe Rising Main Network, Hdpe Pn10 Distribution Pipeline Network, Pump Hous E, Sitc Electro Mechanical Work Including Scada, Solar System And Other Related E M Work Etc., Area Development And Approach Road, Road Resurfacing Work In 19 +4 Panchaytat Under Chhatapur Block Of Sapaul District, Bihar State With Minimum Six M Onths Of Trail Run And Thereafter Operation & Maintenance Of The Entire System For The Next Five Years..
Day To Day Maintenance Of Pipeline Carrying Water From Intake Well At Kapatghat To Cpp And Other Work
Work For Construction Of Intake Well Inside Chambal River Including Approach Bridge Construction Of Rwr Including All Works Required For Inlet Inside Rwr Outlet System From Rwr To Outlet Chamber Wtp Cwr Rwph And Allied Works Package 1 Under Jjm
Jhansi Division:-Construction Of Intake Well At Ken River And Laying Of Pipe Line And Filter Plant At Banda.
Providing, Supplying Installation, Testing & Commissioning Vt Pump At Sidhhi Sarovar Intake Well At Patan.