Road Side Drain Clearance, Land Slide Clearance With Jungle Cutting For Pre And Post Monsoon At Ch. 16.00 Kmp To 24.90 Km Of Nh 717a At Pedong Bazar To Lingsay Rhenock At Sikkim Border Via Kagay Road Under Kalimpong Division P.w.d.
Road Side Drain Clearance, Land Slide Clearance With Jungle Cutting For Pre Monsoon Of 12th Mile To Nimbong Fatak Road From 9.40 Kmp To 9.90 Kmp, 12.00 Kmp To 13.00 Kmp, 16.50 Kmp To 17.50 Kmp, 19.00 Kmp To 20.00 Kmp, 21.00 Kmp To 22.00 Kmp Pwd
Slip Clearance And Jungle Cutting With Road Side Drain Clearance Of Pedong To Rangpo Via Kashyong Upto Bhalu Marg Road From 0.00 Km To 1.50 Km, 2.00 Km To 3.50 Km, 4.50 Km To 5.50 Km, 6.00 Km To 8.00 Km. Upto 15.50 Km Under Pwd Kalimpong Division
Construction Of Drain And Culvert Clearance And Jungle Cutting To Rongtong To Maldiram Road Via Shivkhola From 0.00 To 24.00 Km During Monsoon Period Under Kurseong Sub Division Under Darjeeling Division Pwd During 2025-2026.
Construction Of Cd At Rd 300m And Fall At Rd 270m With Jungle Clearance Bank Strengthening Of Sub Minor
Restoration Of Roads By Way Of Slip/drain Clearance, Jungle Clearance And Rbm Filling During The Year 2025-26 I.e Rai To Goran, Surara, Nichla, Kraki Sandhi Road Sangwali Road And Other Adjoining Links Ghagwal Area Upper Side Of Nh, Upper Section Of Nh
Restoration Of Road By Way Of Slip/drain Clearance Jungle Clearance And Rbm Filling During The Year 2025-26 I.e Link Road To Kaink Mawa, Refugee Mohalla, Link Road Chillayari To Chachwal, Link Road Sarthian To Chachwal, Link Road Chachwal To Khowara,
Restoration Of Roads By Way Of Slip/drain Clearance, Jungle Clearance And Rbm Filling During The Year 2025-26 I.e Link Road Osk To Panjgarai, Link Road To Panjgarai Sainia, Link Road Lala Chak To Sadda Chak, Link Road To Muthi Jharu, Link Road To Sadwa
Estimate For Jungle Clearance, Silt Removal And Strengthening Of Inspection Path Along Left Main Canal From Ch 0.000 Km To Ch 16.000 Km Of Kaddam Narayana Reddy Project
Armo Civil Works At Puducherry Airport. Sh Bush/Grass Cutting And Jungle Clearance In Operational Areas During 2025-26