"नये भारत का नया Tender Portal"
Request a call back

Latest Tenders for leak detection system

Total 116 tenders found
#TBR: 34919708 New

Construction

  • Delhi
  • Due On: 28 Jul, 2025 (2 Days Left)

Sh Sitc Of Gas Train Assembly Multiblock Pipe Gas Leak Detection System Valves Etc For Natural Gas Line For Boilers Crupp Boilers Make Rmo Electrical And Mechanical Services At M V Hospital Pooth Khurd Delhi

5.35 Lacs
View Tender
#TBR: 34570827 Closed

Scientific Research/instruments

  • Telangana
  • Due On: 21 Jun, 2025 (0 Days Left)

Gem Bids For Css116 Test System Rf Signal Gennerators Rf Cables And Shielding Enclosure Leak Detection System, 5 Cs116 Test System Shielded Enclosure Leak Detector System Rf Signal Gennerator 250 Khz To 40 Ghz Rf Signal Gennerator 10 Khz To 1 Ghz Rf Cable Assemblies

Ref. Document
View Tender
#TBR: 34534681 Closed

Aluminium

  • Orissa
  • Due On: 13 Jun, 2025 (0 Days Left)

Gem Bids For 1 Chlorine Gas Leak Detection System

Ref. Document
View Tender
#TBR: 34151169 Closed

Telecommunication Services And Equipments

  • Andhra Pradesh
  • Due On: 17 Mar, 2025 (0 Days Left)

Providing Water Leak Detection System In Data Centre, 1St Floor At Sdc Ou Hyderabad

1.20 Lacs
View Tender
#TBR: 33902894 Closed

Electronics

  • Andhra Pradesh
  • Due On: 10 Feb, 2025 (0 Days Left)

Supply of 1 Helium Based Leak Detection System

Ref. Document
View Tender
#TBR: 33834976 Closed

Scientific Research/instruments

  • West Bengal
  • Due On: 07 Feb, 2025 (0 Days Left)

Supply of Bi-Metalic Flanges Super Bellows High Vacuum Accessories With Helium Leak Detection System

Ref. Document
View Tender
#TBR: 33841161 Closed

Railway Transport

  • Telangana
  • Due On: 04 Feb, 2025 (0 Days Left)

Supply of Supply, Installation And Commissioning Of Fire Suppression In Smart Cabinet. Detailed Te Chnical Specifications As Per Annexure-I And Special Conditions As Per Annexure-Ii . Warranty Peri Od: 24 Months After The Date Of Delivery Intelligent Integrated Smart Rack Infrastructure, Standalone System Design, Engineerin G, Manufacture, Assembly, Testing At Manufacturer Works, Supply, Delivery At Site, Unloading, Handlin G, Proper Storage At Site, Erection, Testing And Commissioning At Site Of Complete Infrastructure For Th E Proposed Smart Rack Solution To Be Installed At Coe/Iriset As Detailed In The Attached Technical Spe Cification, Complete With All Accessories Required For Efficient And Trouble-Free Operations. The Critical Components Of The Smart Rack Solution Should Be Maintained Easily In The Events Of Failure. All The Co Mponents Of The Infrastructure Should Be Such That It Can Be Easily Dismantled And Relocated To Differ Ent Location. The Integrated Smart Rack Solution With Inbuilt Hot And Cold Aisle Containment Of 2 Rack Should Cater It Load Up To 7 Kw. Integrated Smart Rack Solution Essentially Should Include Environme Ntal Controls, Rack Mounted Air Conditioning, Ups, Smoke Detection, Water Leak Detection And Humidit Y Sensors And Security Devices. Environmental Monitoring Shall Be Done From Ip Based Software. The I Ntegrated Smart Rack Solution Must Be Ce Certified. The Critical Components Like Cooling Unit, Ups, Ra Ck, Rack Pdu & Monitoring Unit Should Be From Same & Single Oem For Better Integration & Service Sup Port. The Intelligent Integrated Infrastructure Shall Have Following Components: - Rack Based Closed Lo Op Air-Conditioning The Smart Rack Should Be Equipped With Rack Mounted Cooling Unit To Provide Clo Sed Loop Cooling System Which Should Be Able To Cool The Equipment Uniformly Right From 1St U To 42N D U Of Rack. Rack Mounted Air-Cooling Unit Should Be Of 7Kw/2Tr Capacity, N+N Topology 02 No. Of 7 Kw Rack-Based Cooling Unit. Rack Based Air Cooling With Indoor - Out Door Design, Shr Greater Than 0 .9, 100% Duty Cycle, Scroll Compressor, 9U Rack Mountable, Electronically Commutated Ec Fan, High Pressure & Low-Pressure Protection, Washable Filter With 80% Efficiency Down To 20-Micron, Hydrophi Lic Evaporator Coil, On/Off Switch At Indoor Unit For Emergency Purpose, R407c/R410a Refrigerant. T He Condenser/Outdoor Unit Should Comprise Of Scroll Compressor. The Unit Should Support Ambient Te Mperature For 0 To 45 Degree Celsius. The Unit Should Support Indoor To Outdoor Copper Piping Distanc E Up To 30 Mtrs Including Vertical Piping Distance Up To 10 Mtrs. Power Distribution: 0U, Vertical Rack Pdu With Unit Level Monitoring, 32A, 230V, 7.3Kw, Vertical, 36 Iec C13, 6 Iec C19, 3M Power Cord With 2P+E Ip44, Black Powder Coat. The Ipdu Should Have Following Features- Input Power Monitorin G With Breaker Level Current Monitoring. Daisy Chain Ethernet Connectivity. Local High Visibility Led Di Splay. Phase A Monitoring Kwh, W, Va, Pf, V, A. Protocols Supported: Dhcp, Http, Https, Ipv4, Ipv 6, Ldap, Ntp, Radius, Rstp, Ssh, Smtp, Snmp V1/V2c/V3, Syslog, Tacacs+ . Maximum Operating T Emperature : 60 Degree Celsius/ 140F . Certification/Agency Approvals: Ce, En55032 & En55024, Iec62368-1, Rohs. Electrical Distribution System: Rack Mountable Power Output Device With Essentia L Breakers To Be Provisioned. All Input Supply Cables From Pod Unit To Equipment Are Connected With I Ndustrial Socket Male - Female With Suitable Rating. Environmental Controls: Intelligent Smart Rack 02 Nos. Should Include Basic Environmental Controls: Smoke Detector, Water Leak Detection System, Temperature/ Humidity Sensor, Door Sensor, Alarm Beacon. Remaining Spec For Racks And Accessorie S, U Space, Monitoring, Safety And Security, Ups System . Detailed Technical Specifications As Per An Nexure-I And Special Conditions As Per Annexure-Ii. Warranty Period: 24 Months After The Date Of Delivery Delivery, Unloading, Shifting To Site, Positioning, Installation, Testing And Commissioning With Supply And Installation Of 12Mtr Low Side Material And Project Management Work. Detailed Tech Nical Specifications As Per Annexure-I And Special Conditions As Per Annexure-Ii .

Ref. Document
View Tender
#TBR: 33798145 Closed

Crude Oil / Natural Gas / Mineral Fuels

  • Orissa
  • Due On: 28 Jan, 2025 (0 Days Left)

Installation Of Leak Detection System Lds On Hydrocarbon Pipelines Between Soj And Refinery And Between Marketing Terminal And Paradip Refinery.

2.92 Crore
View Tender
#TBR: 33752743 Closed

Crude Oil / Natural Gas / Mineral Fuels

  • Orissa
  • Due On: 21 Jan, 2025 (0 Days Left)

Installation Of Leak Detection System Lds On Hydrocarbon Pipelines Between Soj And Refinery And Between Marketing Terminal And Paradip Refinery.

2.92 Crore
View Tender
#TBR: 33730938 Closed

Power

  • Maharashtra
  • Due On: 29 Jan, 2025 (0 Days Left)

Supply of 8 Sg6 Gas Leak Detection System With Alarm Hooter

Ref. Document
View Tender
Download Document