Perigottukurrissigp 2025-26 Peruvala Lift Irrigation Phase 2
Releasing Of New 845 Hp Cd 630 Kva Ht-lip Connection In Favor Of M/s Utrana Lift Irrigation Project C/o Aen Water Resources Department Bundi Under Aenonm Jpd Lakheri On Labour Rate Of Arc-2025 Basis Under Tn-37/2025-26
Installation, Electrification And Energisation Of 17 Nos Dbw Lift Irrigation Projects. Installation, Electrification, Energisation And Commissioning Of 17 Nos Bore Well Projects On Cluster Basis At Samantarapur Under Digapahandi Block In Ganjam District Rehabilitation Assistance
Permanent Restoration Of Inspection Path From D-25 And Distributory Canal Of Nizamsagar Main Canal To Damarancha Main Lift Irrigation Scheme-2d Call
Supply, Erection And Commissioning Of 250 Kva Diesel Generators For O And M Of Koilsagar Lift Irrigation Scheme Pump Houses Stage-i At Nagireddypallyv, Narvam And Stage-ii At Teelair V, Marikal M
Koilsagar Lift Irrigation Scheme Pump Houses Stage-i And Stage-ii Estimate Of Balance Works And Repairs And Replacements Of Em And Hm Works
Kodanda Rama Swamy Lis Repairs To Pumps And Motors Control Panel And Supply Of Electro-mechanical Consumables For Kodhanda Rama Swamy Lift Irrigation Scheme Located On Muthyala Branch Canal @ Km 5.300 Near Akupamula Village, Munagala Mandal
Supply, Installation And Testing Of 10 Hp Solar Submersible Pump For Construction Of Lift Irrigation Scheme And Construction Of Irrication Canal At Rt Thang Terchayunder Capex.
Providing Consultancy Services For Lift Irrigation Pipeline Network From Kadana Reservoir To Various Tanks Of Remaining Kadana Taluka.
Providing Consultancy Services For Lift Irrigation Pipeline Network From Mahi River To Various Talav’S Of Khanpur Taluka.