Maintenance Operation At Pump House 1a B And Tembhu Barrage Premises Of Tembhu Lift Irrigation Project And Providing Manpower And Driver For Office Work For Year 2025-26
Sub Head Consultancy Service For Preparation Of Detailed Project Report For Providing Lift Irrigation Project To Gram Panchyats Chabutra, Ree, Banal And Darla In Tehsil Sujanpur
Construction Of 132 Kv Dcss Line Of 21.243 Km. From 132 Kv Substation Malhargarh For Power Supply To Pressurized Micro Lift Irrigation Project And 01 No. 132 Kv Feeder Bay At 132 Kv Substation Malhargarh.
Supply Of Manpower For Manitenance, Installation Of Cctv For Security And Other Related Works At The Pump House Of Haranghat, Wagholi Butti, Jibgaon And Borghat Lift Irrigation Scheme Under Asolamendha Project Renovation Division No.02, Taluka Sawali
Krishna Koyana Lift Irrigation Project - Providing And Erecting Chain Link Fencing And Other Allied Work At Arag Colony Under Mhaisal Lift Irrigation Scheme.
Construction Of Adyal Lift Irrigation Scheme Under Gosikhurd Project, Tal. Bramhapuri, Dist. Chandrapur.
Tembhu Lift Irrigation Project Repairs Maintenance Operation And Supplying Manpower And Ancillary Work Of Electrical Mechanical And Civil Part At Tembhu Ph Stgae 1A 1B Stage 2 3 4 And 5 Visapur Lis Stage 1A 1B 2 3 Pundi Lis 1A 2A 2B
Construction Of 132 Kv Dcss Line Of 21.243 Km. From 132 Kv Substation Malhargarh For Power Supply To Pressurized Micro Lift Irrigation Project And 01 No. 132 Kv Feeder Bay At 132 Kv Substation Malhargarh.
Krishna Koyna Lift Irrigation Project- Mhaisal Lift Irrigation Scheme- Kavathemahankal Part- Construction Of Arag Bedag Lift Irrigation Scheme Tal. Miraj Dist. Sangli And Borgaon Lift Irrigation Scheme Tal. Kavathemahankal Dist. Sangli
Sale Of Excavated Material Stone Stone Chips Murum Etc Available From Canal Excavation Of Tembhu Lift Irrigation Project Hingangaon Tank To Mahuli Pump House Stage 3a Canal Km 30 To 31 In Taluka Khanapur