Raking Out Joints In Lime Or Cement Mortar And Preparing The Surface, Erection Of Scaffolding With Bamboo Frame In Double Layer With Working Platform, Cost And Charges For Transportation Of Scaffolding Materials, Etc. As Mentioned In Boq. Execution Of Work Under Mw Un-protected Conservation Of Fort Wall From Bastion 3 To Bastion 6 And Adjoining Excavated Site At Vadnagar
Lime Grouting, Removal Of Old Cement Mortar Pointing And Providing Pointing In Lime Mortar In The Flooring And Walls, Laying Of Brick Jelly Lime Concrete Using Nominal Size Brick Aggregate Near The Joints Of Main Temple At Ramappa Temple
Gem Bids For Dismantling Of Plain Or Corrugated Steel Sheeting Any Gauge Thickness Including Nainital Or Similar Pattern Roof Covering Setc Complete All As Specified, Dismantling Of Plain Or Corrugated Ac Sheeting Any Gauge Thickness Including Nainital Or Similar Pattern Roof Coverings Etc Complete All As Specified., Dismantling Of Framed Work Timber Scantlings 40sqcm And Over In Section In Any Position Complete All Asspecified And As Directed, Dismantling Of Framed Timberscantlings Under 40 Sqcm In Sections Forfilletsrailspostsrafters Purlins Etc Complete All As Specifiedand Directed By Enggincharge., Demolition Of Brickwork Orstone Boulder Masonry Built In Lime Mortar Including Allquoins Arches Pillars Etc But Excluding Ashlar Facingsdressed Stonework, Dismantling Of Structural Steel Workincluding Doors Gates But Excluding Framed Truss Etc.complete All As Specified And As Directed, Dismantlingwrought Iron Or Mild Steel Work Of Any Description Nototherwise Provided For Complete All As Specified And Asdirected By Enggincharge., Taking Down Chowkhats Orframes Not Exc.1.50 Sqm Each Without Taking Off Shuttersfrom Frames Complete All As Specified And As Directed Byenggincharge., Taking Down Chowkhats Or Frames Exc 1.50sqm But N Exc 4.00 Sqm Each But With Shutters Withouttaking Off Shutters From The Frame Complete All As Specifiedand As Directed By Enggincharge., Demolition Of Cementconcrete Unreinforcement In Ground Floors And Pavings Nexc 15 Cm Thickness Below Or Above Ground Level Completeall As Specified., Surface Excavation N.exc Not Exceeding 30cm Deep And Averaging 15cm Deep And Getting Outharddense Soil Complete All As Specified., Removingbuilding Material Etc To A Distance 2km Including Loadingand Unloadingstacking At The Destination Complete All Asspecified., Pick Axe As Per Is 273 Q4
Renovation Of Temple Using Lime Mortar, Vargapoochu Panchavarna Painting, Repairing The Pressed Tiles, Water Washing, Pointing The Thirumathil Wall, Repairing The Vimanams And Rajagopuram Panchavarna Painting Providing New Cut-Stone Flooring Repaid And Renovation Of Arulmigu Athijeganathaperumal Temple, Thiruppullani, Ramanathapuram District
Supply Of Material - Dabadi Tiles, Cement, Stone, Gravel, Marbles, Stone Chips, Planks, Oslets, Chape, Iron Rods, Angles, Iron, Iron Girders, Doors, Windows, Pvc Pipes, Cement Mesh, Kota Stone, Lime Mortar, Enamel Paint, Various Machinery Like Vibrators, Mixers,
Supply Of Mortar-clay / Mud Mortar, Lime From Kali Kiln For Lime Masonry Work
Supply Of Material Ghadla/kankar/jhajhra, Mortar-mitti/mud Masala, Lime Lime From Kali Kiln For Masonry Work, P.p.c.cement, White Cement, Fine Aggregatesand/gravel, Fine Aggregategravel - Local, Fine Aggregaterakhi (fly Ash,) Fine Aggregatesurkhi, Fine Aggregatestone Dust (stone Dust, In Masonry Work,) 40mm Measured Stone (grit Broken By Hand) (cut Voids 1/11), 40mm Stone (broken By Crusher) (cut Voids 1/11,) 20mm Stone Grit (broken By Crusher,) 12/10/6mm Stone Grit (broken By Crusher,) Brick Ballast, Material For Road Work (including 5 Km Lead) 63-40mm Crusher Broken, Stone Aggregate(cut Voids 1/11),
Provide Construction Material Ghadla/kankar/jhajhra Mortar-soil/mud Masala Lime From Kali Kiln For Lime Masonry Work P.p.c. White Cement Sand/gravel Gravel - Local Fly Ash Surkhi Stone Dust (stone Dust, In Masonry Work) 40mm Measured Stone (hand Broken Grit) (cut Voids 1/11) 40mm Stone (crushed Grit) (crushed Grit 1/11) 20mm Stone (crushed Grit) 12/10/6mm Stone (crushed Grit) Brick Ballast 63-40mm Stone Crushed Stone (cut Voids 1/11) 63-40mm Stone Crushed Stone (cut Voids 1/11) 90-45mm Stone Crushed Stone (cut Voids 1/11)
Provide Construction Material Ghadla/kankar/jhajhra Mortar-soil/mud Masala Lime From Kali Kiln For Lime Masonry Work P.p.c. White Cement Sand/gravel Gravel - Local Fly Ash Surkhi Stone Dust (stone Dust, In Masonry Work) 40mm Measured Stone (hand Broken Grit) (cut Voids 1/11) 40mm Stone (crushed Grit) (crushed Grit 1/11) 20mm Stone (crushed Grit) 12/10/6mm Stone (crushed Grit) Brick Ballast 63-40mm Stone Crushed Stone (cut Voids 1/11) 63-40mm Stone Crushed Stone (cut Voids 1/11) 90-45mm Stone Crushed Stone (cut Voids 1/11)
Renovation Of Temple Using Lime Mortar, Vargapoochu Panchavarna Painting, Repairing The Prerssed Tiles, Water Washing, Pointing The Thirumathil Wall, Repairing The Vimanams And Rajagopuram Panchavarna Painting Providing New Cut-stone Flooring Repair And Renovation Of Arulmigu Athijeganathaperumal Temple, Thiruppullani