Electrical Arrangements For :a)pudi (pdd) Yard Remodelling B) Removal Of Non Standard Layout And Provision Of Additional Loop Line On Down Direction At Veppagunta(vga) In Arakkonam(ajj)-renigunta(ru) Section C)provision Of Electrically Operated Lifting Barriers And Emergency Sliding Booms At Leftover Lc Gates In Arakkonam(ajj)-renigunta(ru) Section D)arakkonam Junction (ajj) -road Mobile Unusual & Restoration Unit At Ajj
Project Supervision Services (pss) For Construction Sites Of Road Over Bridges (robs)/ Road Under Bridges (rubs), Goods Sheds, 12 M Wide Fob, Additional Loop Line Or Other Works As Per Rfp Under Gati Shakti Unit Kota, West Central Railway.
Trd Works In Connection With Providing Additional Loop Line At Sanosara
General Electrification Work In Connection With Miscellaneous Telecom Works- Standby Master Telephone, Strengthening Ofc Media & S&t Service Building In Place Of Porta Hut, Miscellaneous Signalling Work For Raising The Sectional Speed 130 Km/h In Rampur-lalkuan Section, Extension Of Relay Room At Kashipur Station, Interlocking Of 06 Nos. Lcs Having Restricted Visibility In Various Sections, Provision Of 2nd Loop Line At Aliganj Station And Construction Of Electric Loco Trip Shed At Lalkuan Yard Of Izzatnagar Division.
Ner-ljn Division:- Provision Of Dn Extended Loop Line At Jagatbela Railway Station In Gd-gkp Section.
Construction Of Ballastless On Pf-1(loop Line No.1), Dn Main Line No.2, Pf-2 (up Loop Line No.3), Pf-3 (loop Line No.4) At Sabarmati (sbt) & Other Ancillary Works Under Jurisdiction Of Divisional Engineer (works)-ahmedabad
(1) Construction Of Longitudinal & Cross Drain, Cross Over Correction & Realignment Of Non Designed Curve In Passenger Loop Line And Goods Line Affecting Passenger Line In All Yards In Sse(p.way)/dgg Under The Jurisdiction Of Aden/dongargarh. (2) Deep Screening Of Yard Lines, Construction Of Longitudinal & Cross Drain, Cross Over Correction & Realignment Of Non Designed Curve In Passenger Loop Line And Goods Line Affecting Passenger Line In All Yards In Sse/pway/rajanndgaon (rjn) Under The Jurisdiction Of Aden/dongargarh.
Construction Of New Station Building In Connection With Sanctioned Work Of:- Construction Of Additional Loop Line (csr 750 Meter) With New Station Building With El At Pusla Station.
(1) Improvement And Strengthening Of Passenger And Non-passenger Loop Lines By Ctr(p/s) In Rrl,tar, Chcr, Sal Yards Including Increase In Speed Potential Of Tar Yard Loop Lines From 15 Kmph To 30 Kmph At Under The Jurisdiction Of Aden(tr.)/ngp (2) Conversion Of 52 Kg 1 In 8.5 Turnout With 60 Kg 1 In 12 Layout In Tmr Yard. (3)strengthening Of Passenger And Non Passenger Loop Lines Along With Lifting Work Of Loop Line To Elevate Longitudinal Profile Equal To Corresponding Main Line At Brd, Koka & Khat Yard. (4) Casual Renewal Of Rails Of D- Marked And Obs Rail Under Various Yards In Main Line Of Nagpur Division. (5) Casual Renewal Of Rails Of D Marked And Obs Rail Under Various Yards In Branch Line Of Nagpur Division. (6)construction Of Standard Dead End/sand Hump, Renewal Of Turnout Sleepers And Cess Repair Work Under The Jurisdiction Of Aden/tr/ngp.
S&t Work In Connection Including Outdoor Works Along With Provision Of (a)additional Loop Line At Dumrikhurd Station(pi Station) And Modification, Alteration In Existing Electronic Interlocking In Connection With Provision Of Additional Loop Line At Parmalkasa Station And Gangajhari Station Of Nagpur Division Of Secr. (b) Modification, Alteration In Existing Electronic Interlocking In Connection With Provision Of Hs-spart Siding At Nainpur Station Of Nagpur Division Of Secr.