Earthwork In Formation Including Filling, Cutting, Blanketing , Construction Of Retaining Wall, Trolley Refuges And P.way Works Like Linking Of B.g. Track & Turnouts, Provision Of Glued Joint & Sej's, Dismantling Of Existing Track & Turnouts, Supply And Handling Of Ballast, Leading Of P-way Materials And Others Allied Works In Connection With Work Of Provision Of Additional Loop Line At Utratia Station Yard Of Lucknow Division On Northern Railway Under Dy.ce-c-iv-lko.
Track Work For Additional Loop Line At Duriyaganj And Khargapur Stations Of Lalitpur-khajuraho Section Of Jhansi Division.
Signalling Work In Connection With (1) Extension Of Up & Dn Loop Line To Achieve 753 M Csr At Waghoda On Bhusawal Division. (2) Various Signalling Works In Connection With (trr/ctr Work) On Bhusawal Division.
Design, Supply, Erection Testing And Commissioning Of 25 Kv, Single Phase, Ac Ohe Works In Connection With The Following Works : A.provision 2 Nos. Of Stabling Line 750m (up & Dn Loop) In Up Direction At Bsl End Of Devlali Station. B.provision Of C&w Examination And Stabling Facilities At Devalali Station Phase -ii. C.provision Of 2 Nos. Of Stabling Line Of Nashik Station. D.provision Of Extension Of Cop On Pf No. 2/3 Csmt End At Nashik Road Station. E.provision Of Cover Over Platform (cop) On Pf No. 4 At Nashik Road Station.
Execution Of P Way Works Including Laying And Linking Of Bg Track For Main Line, Loop Lines Including Points & Crossing At Yards, Supply And Spreading Of Ballast, Transportation Of P Way Materials ,tamping Of Track And Other Miscellaneous Works In Connection With Multi Tracking Between Chhayapuri- Bajwa.(2 Km)
Electrification Of Extended Loop Line No. 5 At Baruachak Station In Ljn Division Of N.e. Railway.
Work Schedule :electrical Work (a) Kudra Yard Remodelling At Ktq For Eliminating The Shunting In Mainline By Provision Of Overrun Line In Dn And Up Loop Lines.(b)ganjkhawja Provision Of Over Run Line In Up Loop Line At Gaq Station.
Secondary Tsr Of Loop Lines & Deep Screening Of Loop Line In Bgkt And Ju Yard In The Section Of Sse/pw/ju Under Aden/line
Electrical (trd) Work For Additional Loop Line At Nmt Station
Provision Of Pathways Adjacent To Longer Loop Line At Gumada And Dumuriput Under The Jurisdiction Of Senior Divisional Engineer/north Of Waltair Division.