maximum demand controller Tenders | Latest Tenders for maximum demand controller
Tender Bharat Website covers all Tenders for maximum demand controller – Including maximum demand controller Government Tenders, e Tender maximum demand controller, maximum demand controller Tenders and Private Tenders. There is no shortage of business opportunities from the largest maximum demand controller Tender Database.
Our website allows you to find maximum demand controller tenders online quickly and easily.
Subscribers can also opt to receive daily tender alerts through email from TenderBharat.com to guarantee they don't miss out on any opportunities.
maximum demand controller Tenders
Total 5 maximum demand controller tenders found
#TBR: 33393024
Closed
Railway Transport
Gujarat
Due On: 03 Dec, 2024
(0 Days Left)
Supply of Spec: Accuracy Class 1.0, 0, 0.5S, Input Voltage Measurement R Ange 50-520 Vac P-P, Aux Supply 80-300V Ac/Dc, Ct Secondary Site Selectable 1A/5A, Flush Mounting 96X 96Mm, Ct/Pt Site Programmable, Data Log 8Mb, 4Relay Output For Max. DemandController, Time Of Delay Tod 6 Slots, Block/Sliding Window Site Selectable, Running Demand, Max Demand, Prediction Demand In Single Page Window, Individual Harmonics, Meter With Rs485 Make : L&T, C&S, Abb, Siemens, Schneider, Y Askawa. Warranty Period: 30 Months After The Date Of Delivery
Supply Of MaximumDemandController With Following Specifications: Connection Type- Common Product For Ht3/ Ht4/Lt Application # Wiring Configuration- Common Product For 3 P-3 W And 3 P-4 W Application # Measurement Voltage Range- 57.7 V100v - 240 V 415 V Ac 3 Phase 4 Wire 3 Phase 3 Wire # Tolerance- -30% To +20% Of Vn # Aux Power Supply Range- 80 - 300 V Ac/Dc # Current Range- 1-2A And 5-10 A # Frequency- 50/60Hz With +, - 5% # Accuracy Class- 0.2S # Current Ckt Burden: 1 A - 0.05Va Per Phase, 5 A - 0.25 Va Per Phase # Voltage Ckt Burden: 0.15 Va Per Phase # Energy Type Active Imp T, Apparent Imp, Active Forwarded, Apparent Forwarded # Averaging Period 1Min Or 5Min # Trip Circuit 3 Circuit # Alarm Activation Time Active For 30 Seconds Or Active For Whole Averaging Period # Short Time Over Current 20 X Imax For 1 Sec., 10 X Imax For 3 Sec., 7 X Imax For 10 Sec. Make: Secure Meters Ltd, Or Equivalent In All Respect. Warranty Period: 120 Months After The Date Of Delivery
Providing, Installation, Testing And Commissioning Of DemandController With MaximumDemand Sensing Unit At 33Kv Surface Substation Of Nawapara Ug Mine Of Bhatgaon Area