Upgradation Of The Web Portal For The Mukhyamantri Matikala Rozgaar Yojna Management System, Including The Online Training Monitoring System And Tool Kits Distribution Management System Modules For Uttar Pradesh Matikala Board
Gem Bids For Sitc, Red Hat Enterprise Linux, Next Generation Firewall, Network Analyzer, Network Monitoring Tool, Core Networkswitch, Enterprise Storage Q2, San Switch Q2
Gem Bids For Procurement Of Routers And Router Monitoring Tool
Request For Proposal For Procurement Of Atm Cash Dispenser Machine Along With Atm Terminal Management N Monitoring Software Tmms Tool N Otc Lock Management Software Olms Tool
Gem Bids For Annual Maintenance Service -data Center Assets - Compute; Application Monitoring Tool; Oem Authorised Service Provider
Procurement Of Database Activity Monitoring Software Tool For Datalake Project At Apsdc
Custom Bid For Services - Supply Implementation And Maintenance Of Atm Monitoring Tool
Supply, Installation, Configuration And Commissioning Of Enterprise Grade Antivirus Protection Solutions In The Pcs And Connected To A Centralized Av Server Console For Signature Updation With Monitoring Tool At Main Office, Zonal Offices, Divisi Tiruppur Corporation Gf 2024-25 14
Tiruppur Corporation Supply Installation Configuration Commissioning Enterprise Antivirus Protection Solutions In Pcs Centralized Av Server Console Signature Updation Monitoring Tool At Main Office Zonal Offices Division Offices Collection Counter
Supply, Installation, Testing And Commissioning Of Smps Based Integrated Power Supply Ips System As Per Rdso Spec. No.Rdso/Spn/165/2023 Ver.4.0 Amendment 1.0 Along With Surge Protection D Evice, Status Monitoring Panel, Spares, Tool Kit, Lmla Battery Consisting Of 55 Plus 5 Cells Cells As Per Rdso Spec. Irs:S-88/2004 Along With Battery Stand.The Configuration Of Ips Should Be As Per Ncr/Hq Drawing N O. Typ/2017 /0002-10 For Ibs With Lc Gate . This Include Transportation To Consignee Depot To Site, Installati On And Commissioning Of Integrated Power Supply System After Duly Filling Pre Commissioning Checklist Join Tly By Rdso Approved Vendor And Railway Representative. Warranty Period: 48 Months After The Date Of Delivery Supply, Installation, Testing And Commissioning Of Smps Based Integrated Power Supply Ips System As Per Rdso Spec. No. Rdso/Spn/165/2023 Ver.4.0 Amendment 1.0 Along With Surge Protection D Evice, Status Monitoring Panel, Spares, Tool Kit, Lmla Battery Consisting Of 55 Plus 5 Sells Cells As Per Rds O Spec. Irs:S-88/2004 Along With Battery Stand . The Configuration Of Ips Should Be Per Ncr/Hq Drawing N O. Typ/2017/0002-11 For Relay Hut /Lsc With Aftc, Axle Counter And Lc Gate.This Includes Transportation T O Consignee Depot, From Consignee Depot To Site, Installation And Commissioning Of Integrated Power Suppl Y System After Duly Filling Pre Commissioning Check List Jointly By Rdso Approved Vendor And Railway Repre Sentative. Warranty Period: 48 Months After The Date Of Delivery Supply And Commissioning Of Smps Based Integrated Power Supply System For Interlocked Lc Gate In Re Section As Per Rdso Specn.No. Rdso/Spn/165/2023 Ver.4.0 Amendment 1.0 As Per Drawing Attached Nc.Rly. Drg. No. Typ/2017/0002-09 Of Along With Battery Set Of 1 10V/300Ah. This Include Transportation To Consignee Depot To Site, Installation And Commissioning Of Integr Ated Power Supply System After Duly Filling Pre Commissioning Checklist Jointly By Rdso Approved Vendor A Nd Railway Representative. Warranty Period: 48 Months After The Date Of Delivery Supply Installation Testing And Commissioning Of Smps Based Integrated Power Supply Ips S Ystem, As Per Rdso Spec. No. Rdso/Spn/165/2023 Ver.4.0 Amendment 1.0 Along With Surge Protection D Evice, Status Monitoring Panel, Spares, Tool Kit, Lmla Battery Consisting Of 55 Plus 5 Cells Cells As Per Rds O Spec. Irs:S-88/2004 Along With Battery Stand. The Configuration Of Ips Should Be As Per Ncr/ Hq Drawi Ng No. Typ/2017/0002-06 For Ei Station Up To 04 Lines With Block Panel And Lc Gate. This Includes Transport Ation To Consignee Depot From Consignee Depot To Site, Installation And Commissioning Of Integrated Power Supply System After Duly Filing Pre Commissioning Check List Jointly By Rdso Approved Vendor And Railway R Epresentative. Warranty Period: 48 Months After The Date Of Delivery Supply, Installation Testing And Commissioning Of Smps Based Integrated Power Supply Syste M Ips , As Per Rdso Spec. No. Rdso/Spn/165/2023 Ver.4.0 Amendment 1.0 Along With Surge Protection Device, Status Monitoring Panel, Spares, Tool Kit, Lmla Battery Consisting Of 55 Plus 5 Cells Cell As Per Rds O Spec. Irs-S-88/2004 Along With Battery Stand. The Configuration Of Ips Should Be As Per Ncr/Hq Drawin G No. Typ/2017/0002-08 For Ei Station Up To 6 Lines With Block Panel And Lc Gate. This Include Transportatio N To Consignee Depot To Site, Installation And Commissioning Of Integrated Power Supply System After Duly Fi Lling Pre Commissioning Checklist Jointly By Rdso Approved Vendor And Railway Representative. Warrant Y Period: 48 Months After The Date Of Delivery