And Maintenance Of Water Pipe Line With Fittings And Connected Works At Pocket I And Ii, / Maintenance Of Submersible / s/ Earthing Connected Works At Chaf Bangalore
/Maint Of Centrifugal , , Submersible Machinery, Lt Panel And Misc E/M Work And Improvement Of Installation At Rrrc, Lorry Road, Aepta, Dk Part-I, Ta 105 And Eme Stn Wksp In The Area Of Ge U Water Supply Ge/Ws/Token No-12 Of 2025-26
Special /Replacement Of Submersible , , Booster , Centrifugal , Suction Sweeper, Dosing System And Connected Items Against Ber Installed At Various Installation Under Ge Barrackpore
Annual And Maintenance Of Sewerage Treatment Plant, 31 50 Kld Panel Including Removing All Defective Parts And Providing And Installation Of New Parts Will All Required Wiring And Connection Components. Providing And Fixing Of Multi Port Valve With New Multi Port Valve And All Charges. 1 Hp Bearing And Rewinding Etc. 15 Hp Motor And Rewinding Bearing Mechanical Seal Or Gland Wire Impeller Replacement. Cleaning Of Sewerage Treatment Plant All Tanks With Removing Solid Waste Out From The Tank. Providing And Fixing Of Ss Nut Bolt At Existing Site Including Removing Old Defective Gi Nut Bolt With New Ss Nut Bolt. 1 Hp Motor And Rewinding Etc. Providing And Fixing Of Pressure Gaugemeter At Existing Site Including Removing Old Defective Pressure Gauge Meter With New Pressure Gauge Meterand All Charges. Painting Of Activated Carbon Filter Acf Tank. Painting Of Multi Grade Filter Mgf Tank.
Of Submersible Set Under Division Sikar ing Of Submersible Set
Rewinding And ing Of Existing Waste Disposer Set Capaciy 12.5 Slash 20 Hp By Done The Following A.Rewinding Of Motor, Rewinding And ing Of Existing Waste Disposer Set Capaciy 12.5 Slash 20 Hp By Done The Following B. Cable End Bush, Rewinding And ing Of Existing Waste Disposer Set Capaciy 12.5 Slash 20 Hp By Done The Following C. Temprature Sensor, Rewinding And ing Of Existing Waste Disposer Set Capaciy 12.5 Slash 20 Hp By Done The Following D. Moisture Sensor & Gel Bag, Rewinding And ing Of Existing Waste Disposer Set Capaciy 12.5 Slash 20 Hp By Done The Following E. Oring & Gasket, Rewinding And ing Of Existing Waste Disposer Set Capaciy 12.5 Slash 20 Hp By Done The Following F. Oil Liter, Rewinding And ing Of Existing Waste Disposer Set Capaciy 12.5 Slash 20 Hp By Done The Following G. Ball Bearing Set, Rewinding And ing Of Existing Waste Disposer Set Capaciy 12.5 Slash 20 Hp By Done The Following H. Mechanical Seal Upper, Rewinding And ing Of Existing Waste Disposer Set Capaciy 12.5 Slash 20 Hp By Done The Following I. Mechanical Seal Lower, Rewinding And ing Of Existing Waste Disposer Set Capaciy 12.5 Slash 20 Hp By Done The Following J. Cable Sealing Compound, Rewinding And ing Of Existing Waste Disposer Set Capaciy 12.5 Slash 20 Hp By Done The Following K Foot Plate Complete Set, Rewinding And ing Of Existing Waste Disposer Set Capaciy 12.5 Slash 20 Hp By Done The Following L. Cable 10 Core, Rewinding And ing Of Existing Waste Disposer Set Capaciy 12.5 Slash 20 Hp By Done The Following M. Work Shop Service Charge, Rewinding And ing Of Existing Waste Disposer Set Capaciy 12.5 Slash 20 Hp By Done The Following N. Cartage Both Side, ing Of Control Panel Suitable For Ksb Make Krtuf 100 Des 260 Slash 74 Waste Disposer Set I C Replacemen Of Damaged Slash Burnt Components, Etc Complete As Required. Make Ksb, Supplying And Installation Of Float Switch Complete With Connection Testing Etc As Required., Supplying And Installation Of Cable Wight Complete With Connection Testing Etc As Required., Lowering And Lifting Of Existing 3 Slash 5 Slash 7.5 Hp Submersible Set Etc. Complete As Required., Supplying And Drawing Flat Three Core Pvc Insulated And Pvc Sheathed Copper Cable Size 2.5 Sq Mm Complete With Connection Testing Etc As Required I C Rebate Of Old Material., And Rewinding Of Sub. Motors Of Following Capacity With Cartage Dismantling, Reassembling I C Supply And Replacement ing Of Damaged Parts Of Motors And Making Good For Operation I C Connection, Testing, Painting Etc. Complete As Reqd.A. 3/5 Hp, ing Of Sub Of Flowing Stages And Dia With Cartage Dismantling Reassembling Supply And Replacement ing Of Damaged Parts Of And Making Good For Operation I C Testing Painting Etc. Complete As Required Upto All Stages 6Inches Dia Sub. Set, Supplying And Replacement Of Direct On Line Submersible Starter Panel Single Phase Suitable For 03 Hp Etc. As Required Ic Less Cost Of Replaced Item., Supplying And Replacement Of Star Delta Starter 10 Hp Relay Range 9 To 14 Connection Testing Etc As Required., And Rewinding Of Set Of Following Capacity With Cartage Dismantling, Reassembling I C Supply And Replacement Slash ing Of Damaged Parts Of Motors And Making Good For Operation Ic Connection, Testing, Painting Etc. Complete As Reqd. A. 10 Hp 3 Ph, Supplying And Installation Presure Boosting ing Syatem 01 Hp With 24 Ltr. Tank Connection Testing Etc As Required., Supplying And Replacement Of Pressure Switch In The Existing Pressure Testing Etc. As Required., Lowering And Lifting Of Existing 12.5 Slash 20 Hp Waste Disposer Set Etc. Complete As Required.,
Replacement Of Submersible Star Pelt Starter Dol Starter And Maintenance Of Fire Hydrant Swimming Pool Plant And Certain Connected Allied Works At 39 Wing Af Stn
s Of Different Sizes, 71 Rewinding Of 05 Hp Motor Rewinding Of 03 Hp Rewinding Of 01 Hp
E-Quotation For