Construction Of Water Harvesting Structure Including Ms Frame Fitting, Haudis, Conveyance Unit, Boring With Pipe, And Surface Restoration. Construction Of Rooftop Rainwater Harvesting System Including Allied Infrastructure Works
Supply Fitting Fixing Ms Chequered Plate On The Platrorm Over Delivery Pipes Of Submersible Pupms, On Platform Before Strainers, Acs And Penstock Gates At Mmps Under Bdps. Kmc/ Bdps/mmps/p19/25-26
Gem Bids For Automatic Dcp Map90% Modular 5kg, Ms Pipe Forinstallation Modular & Fitting
I- Ms-Vm Section : Through Sleeper Renewal S Of Existing 52Kg Sleepers With 60Kg /Psc/1540 Nos/Km - 5.334 Km - At Cgl Siding -1 Loop Line From 0. 00 Km - 0.432 Km, Cgl Siding - 2 Loop Line From 0. 00 Km - 0.549 Km, Tmv Road - 1 Loop Line From 0. 00 Km - 0.900 Km, Cgl Road -5 Loop Line From 0. 00 Km - 1.185 Km, Cgl Road -7 Loop Line From 0.00 Km - 1.262 Km & Cgl Road -8 Loop Line From 0. 00 Km - 1.006 Km; Ii-Ms - Vm Section : Through Fitting Renewal For A Length Of 33.125 Km From Km. 41.275 - 59.40 Down, Km. 0.00 - 5.00 Dn Sub, Km. 0.00 - 5.00 Up Sub, Km. 0.00 -5.00 Main. Iii-Ms-Vm Section- Trr S-3.26 Km, - Total - 0.43 Km With 60 Kg Cl.Ii Rails/Lwr, - Main Line - Cgl - Raod -4 From 0.00 Km - 0.43 Km & Total - 2.83 Km With 52 Kg Cl.Ii Rails/Lwr - Loop Line - Kgz Road -1 From 0.00 Km - 0.94 Km, Loop Line - Kgz Road -4 From 0.00 Km - 0.91 Km, Loop Line - Tzd- Road -4 From 0.00 Km - 0.98 Km.
Civil Works Supplying Fitting And Fixing Of M.s. Sign Board At Various Place Of Adda Property.
Gem Bids For Repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Hostels; Pipe Line And Water Tank Fitting, Ms Channel, And Ceiling Fans; Service Provider
Providing, Fabrication And Fitting Of Ms Racks To Store The Office Record In The Newly Created Store Yard In Mhed Jammu
Ms Railing Fitting Work Elc Chouk To Imlikheda And Jailtiraha To Fataka Godown Of Chhindwara
Sh-Sitc Of Lt Panel For Fire Fighting Pump Sets, Providing And Replacement Of Jockey Pump, Ms Pipe, Fitting, Accessories Of Fire Fighthing System At Vikas Minar. M/O Office Building Vikas Minar.
Manufacturing, Fabricating Fitting-fixing Of Ms Strainer At All The Sides Of The Intake Jetty Pump House To Arrest The Foreign Materials In The River Hooghly Of Surface Water Based Water Supply Scheme For Bally-jagacha Under Howrah Division, P.h.e. Wbphed/ee/hd/niet-08 Of 2025-26