Electrical Trd Works For Design, Drawing, Supply, Erection, Testing & Commissioning Of 25kv A.c. Single Phase Overhead Equipment, Lt Supply Transformer For Yard Modification Of Berhampore Court Station In Sealdah Division Of Eastern Railway.
Design, Supply, Erection, Testing & Commissioning Of Overhead Equipment Modification /Infringement Removal Of Ohe Connection With Construction Of Fobs At Different Location Under Ph-53 Phase Ii Over Mumbai Division Central Railway.
Gem Bids For 1 High Intensity Fitness Training Circuit Equipped With Modern Equipment Alongwith Overhead Shelter
Design, Supply, Installation, Testing And Commissioning Of 25 Kv Overhead Equipment Ohe For Elevated Corridor Of Line-10 Saket G Block To Sangam Vihar And Line-5 Ext. Inderlok And Ashok Park Main Station Of Delhi Metro Mrts Phase-iv.
Design Supply Erection Testing And Commissioning Of 25 Kv 50 Hz Single Phase Conventional Type Overhead Equipment Sub Sectioning And Paralleling Post Retractable Rigid Catenary System And Rigid Over Head Conductor System Of Wcl Sasti
Request For Proposal For Supply Of Technical Manpower For Maintenance Of 25kv Overhead Equipment On Main Line And Loop Line Along With Power Supply Installation On Becharaji - Ranuj Section For Period Of 12 Months
Supply, Testing, Commissioning And Training Of Thermal Imaging Camera With 6-deg Telephoto Lens For Condition Monitoring Of Power Supply Installations Psi And Overhead Equipment Ohe Insulators
Design Supply Erection Testing And Commissioning Of 25Kv 50 Hz Single Phase Conventional Type Overhead Equipment Sub Sectioning And Paralleling Post And Associated Modifications Associated General Electrical Work For Construction Of New Line
Supply, Erection, Testing And Commissioning Of Receiving Substation With Incoming Cabling From Grid Substation Including 25 Kv-Ac Traction Cum 33Kv Auxiliary Main Sub- Stations, 25Kv Overhead Equipment, Auxiliary Power Supply And Other Works For Bsrp
Supply of Corrosion Resistant Paint For Outdoor Structures, Masts And Other Equipment Of Overhead Eq Uipment And Traction Power Supply System Exposed To Atmosphere Of Traction Distribution As Per Specn No .Ti/Spc/Civ/Por/0080 Rev1. Warranty Period: 30 Months After The Date Of Delivery Quantity Tolerance +/-: 5 %Age, Item Category : Normal, Total Po Value Variation Permitted: Max 8 Lacs