Demolition Of Existing Overhead Service Reservoir At Nh 11 Rajaldesar Under City Sub Division Ratangarh
Construction Of Overhead Service Reservoir Tank, Public Standposts And Pipeline Network For Yarchos Chenmo To Be Held In The Year 2025 At Mathogonpa/Photang .Under Capex.
Upgradation And Renovation Of Existing Rcc Overhead Service Reservoir 02 Nos. Existing Oht Capacity Of Respectively 165 Kl/ 12Mtr. & 80Kl/12 Mtr, & Constructing, 02 Nos 10 Kl Capacity 12M Staging M.S. Fabricated Structure Including Construction Of Suitable Rcc Valve Chamber In Village Kamarima & Sulesa & Providing, Laying, Jointing, Interconnection, Testing And Commissioning Of 63 Mm Dia Hdpe Class 10 Kg/Sqcm Of 3148 M & 125Mm, 110 Mm, 90 Mm 75 Mm& 63 Mm Dia Hdpe Class 6Kg/Sqcm Of Respectively 543.00, 868.00, 789.00 1686.00 & 4282.00 Mtr. Valve Specials And All Fittings Including All Allied Civil Works, Supplying & Installation Of Energy Efficiant Five Star Bee Rating Isi Marked Required Capacity Three/Single Phase, 50 Hz, 415V, Deep Well Submersible Pump Stainless Steel Body, Suitable For 4/6 Tube Well With Control Panel Starter Suitable For Submersible Pump With Dry Run Protection, Connections, Including Clamps, Bore Cap Etc 08 Nos. As Required As Per Specifications But Excluding Pipe, Ss/Nylonwire Rope And Connection Cable Including Verification Of Tube Well Yield. & Electric Connection From Cseb, Construction Of Brick Masonry Switch Room Of Size 1.80X1.80X3.0 Mtr 08 Nos, Electro Chlorinator System & Room 2.5X2.5X3.0 02 Nos., Boundary Wall 15X15 Mtr. 02 Nos., , Providing 324Nos Functional Household Tap Connection F.H.T.C Pe-Al-Pe Pipe 4898 Mtr In Individual Households And Government Instiution Etc. Complete With Trial Run Operation & Maintanance For 06 Months Under Retrofitting Village Piped Water Supply Scheme Under Jal Jeevan Mission For Village Kamarima & Sulesa
Laying, Jointing Of Upvc / Hdpe Pipeline, Construction Of Elevated Service Reservoir, Switch Room, Overhead Reservoir, Boundary Wall, Submersible Pump Providing & Fixing Work, Electric Connection, Electrochlorinator Installation, Tap Connection & Other Complete Work In Chlorinator Room House & Government Institutes With Testing, 03 Months Trial Run, 06 Months Operation & Maintenance With Complete Materials Etc
Construction And Commissioning Of Overhead Service Reservoir At Rupawato Ka Bera With Rising Main And Distribution Network