P.way Linking Of Bg Track And Other Allied Works Such As Making Connections With Old Existing Track Laying Of Turnouts, Glued Joints, Putting Of Ballast, Leading, Loading, Unloading Of P. Way Material, Ballast Supply, At Welding Work Etc. In Connection With Provision Of Shunting Neck At Pathankot Cantt (ptkc) Railway Station To Facilitate Shunting Movement Avoiding Involvement Of Main Line
Supply Of P-Way Material Fitting On Urgent Basis For Maintenance Of Railway Track At Sstpp, Dongalia Distt. Khandwa
Earthwork In Formation, Blanketing, Trolley Refuges And Construction Of Various Bridges (including Misc. Works Like Pitching, Toe Wall, Floor Protection), Construction Of Passengers Platforms & Circulating Area, Laying And Linking Of Broad Gauge Main Line, Loops Lines Including Points And Crossings, Track Related Activities, Transportation Of P.way Material, Supply And Stacking Of Stone Ballast, Signal & Telecom (outdoor) Design, Supply, Erection, Testing & Commissioning Of 25 Kv Ac Ohe & Sub-sectioning & Paralleling Post (sp/ssp) Works, Modification Of Ht / Lt Track Crossing (up To 11kv), Electrification Of Structures And Other Misc. Works Required For Successful Completion Of Work Between Naliya - Jakhau Port In Connection With New Broad Gauge Line Of Naliya - Jakhau Port Section Of Ahmedabad Division On Western Railway.
Supply Of P-way Material Fitting On Urgent Basis For Maintenance Of Railway Track At Sstpp, Dongalia
Urgent Supply Of Railway P Way Material For Day To Day Routine R And M Work Of Bg Railway Track From Ghoradongri To Sarni Including Siding At Stps
Earthwork In Cutting Filling, Compaction, Blanketing, Construction Of Major Bridges, Minor Bridges, Rub, Retaining Wall Supply & Spreading Of Stone Ballast, P.way Linking, Transportion Of P.way Material Etc. And Other Associated Work From Ch. 0.00 To 3.876 In Connection With Construction Of Banadag Surface Connection Towards Arigada
K Earthwork In Formation, Blanketing, Trolley Refuges And Construction Of Various Bridges (including Misc. Works Like Pitching, Toe Wall, Floor Protection), Construction Of Passengers Platforms & Circulating Area, Construction Of Lc Gate Lodges, Lc Roads, Residual/balance Works Of Robs, Dismantling Of Robs, Laying And Linking Of Broad Gauge Main Line, Loops Lines Including Points And Crossings, Tamping Of Track, Destressing Of Lwrs, Transportation Of P.way Material, Supply And Stacking Of Stone Ballast And Other Misc & Incidental Works Required For Successful Completion Of Work From Chirai (including) To Gandhidham (including) In Connection With Quadrupling Of Samakhiyali - Gandhidham Section Of Ahmedabad Division On Western Railway.
Leading, Loading & Unloading Of P.way Material On Regular Basis For Day To Day Maintenance And Other Allied Works In The Section Of Aden/prg & Aden/on.
T.no.ju/const.iii/t-01-2025-26-mj-bypass - Construction Of Major And Minor Bridges, Earthwork, Including And Filling, Blanketing, Construction Of New Station Building, Other Service Buildings, Platforms, Pf Shelters, Circulating Area. Road Under Bridges, Supply Of Track Ballast Laying And Linking Of New Bg Track Including Turnouts, Sejs, Etc. Transportation Of P Way Material And Carrying Out All Other Ancillary Civil Works And Track Works In Connection With Marwar Bypass New Line Project (3.9 Km.) Of North Western Railway.
Track Linking Works Including Yard Remodelling, Earthwork In Formation, Blanketing, Supply Of Ballast, Transportation And Supply Of P-way Material, Construction Of Minor Bridges, Structural Steel Works & Electrification Works In Chitradurga Yard Between Km:140/490 To Km:142/920 In Tumkur-chitradurga- Davangere New Line Project (composite Work)