Track Linking, P.way Materials Loading Leading Unloading And Other P.way Activities Including Linking, Dismantling Of Turnouts And Various Civil Works At Mirzapur Yard In Connection Ddu-pryj 3rd Line Project.
Execution Of P Way Works Including Laying And Linking Of Bg Track For Main Line, Loop Lines Including Points & Crossing At Yards, Supply And Spreading Of Ballast, Transportation Of P Way Materials ,tamping Of Track And Other Miscellaneous Works In Connection With Multi Tracking Between Chhayapuri- Bajwa.(2 Km)
Maintenance Of Track And Various P.way Related Work Due To Shortage Of Trackman Under Sse/p.way/jnr In The Jurisdiction Of Aden-i/dbg.
Maintenance Of Track And Various P.way Related Work Due To Shortage Of Trackman Under Sse/p.way/dbg In The Jurisdiction Of Aden-i/dbg.
Maintenance Of Track And Various P.way Related Work Due To Shortage Of Trackman Under Sse/p.way/jjp In The Jurisdiction Of Aden-ii/dbg.
Maintenance Of Track And Various P.way Related Work Due To Shortage Of Trackman Under Sse/p.way/ski In The Jurisdiction Of Aden-ii/dbg.
Construction Of 3rd Line Between Naupada (nwp) And Vizianagaram (vzm): (package:03). Execution Of Earthwork In Formation, Blanketing, Minor Bridges (excluding Major Bridges With Formation In Approaches For 100 Meters Length On Either Side And Other Connected Protection Works) Lcs, Lhs, Rubs, Drains, Protection Works, Fobs, Service Buildings, Platform Works, Passenger Amenities, Track Ballast Supply, P.way Works And Other Connected Ancillary Works Etc,. Along With Ohe & General Electrification Works And S&t Utility Shifting Works In Connection With 3rd Line Between Naupada Jn. (nwp-km:702.20) Excluding To Km:740.00 (including Urlam Station) Of Waltair Division In East Coast Railway.
Construction Of 3rd Line Between Naupada (nwp) And Vizianagaram (vzm): (package:04). Execution Of Earthwork In Formation, Blanketing, Minor Bridges (excluding Major Bridges With Formation In Approaches For 100 Meters Length On Either Side And Other Connected Protection Works) Lcs, Lhs, Rubs, Drains, Protection Works, Fobs, Service Buildings, Platform Works, Passenger Amenities, Track Ballast Supply, P.way Works And Other Connected Ancillary Works Etc,. Along With Ohe & General Electrification Works And S&t Utility Shifting Works In Connection With 3rd Line Between Urlam (ulm-km:740.00) Excluding To Km:785.00 (including Sigadam Station) Of Waltair Division In East Coast Railway.
Construction Of 3rd Line Between Naupada (nwp) And Vizianagaram (vzm): (package:05). Execution Of Earthwork In Formation, Blanketing, Minor Bridges (excluding Major Bridges With Formation In Approaches For 100 Meters Length On Either Side And Other Connected Protection Works) Lcs, Lhs, Rubs, Drains, Protection Works, Fobs, Service Buildings, Platform Works, Passenger Amenities, Track Ballast Supply, P.way Works And Other Connected Ancillary Works Etc,. Along With Ohe & General Electrification Works And S&t Utility Shifting Works In Connection With 3rd Line Between Sigadam (sgdm-km:785.00) Excluding To Km:819.60 (including Vizianagaram Station) Of Waltair Division In East Coast Railway.
Construction Of Balance Civil Engineering Works Including Formation, Minor/major Bridges, Rubs/subways, Station Buildings, Staff Quarters, Platforms, Passenger Amenities, Supply & Spreading Ballast, Track Linking, P Way Works And Other Associated Works In Connection With Conversion Of Existing Narrow Gauge Track To Proposed Broad Gauge Track For 25 T Loading Standards Between Dabhoi (excluding) To Waghodiya (including) Railway Stations From Km 33.04 To Km 54.00 (20.96 Km) In Connection With Miyagam- Dabhoi- Samlaya Gc Project In Vadodara Division Of Western Railway.