Erection Of Reconditioned/fabricated Dummy Ms Plates And Ss Liner Plates To The Hitting Areas Of Discharge Chutes, Patch Welding For The Conveyor Chutes Of Bcn-1a/b, 2a/b, Afd-1 And 2 And Connecting Chutes At Tp-1 And Fg-1, 2, 3 And 4 As And When Required In Sec-1 And 2 Mm-i Sub Division Of Mm/chp/btps For The Period From 01.04.2025 Or From The Actual Date Of Commencement Of Work To 31.03.2026.
Erection Of Reconditioned/fabricated Dummy Ms Plates And Ss Liner Plates To The Hitting Areas Of Discharge Chutes, Patch Welding For The Conveyors Bcn-3a/b And Connecting Chutes At Tp2 And Contingency -1 And 2 Chutes As And When Required In Sec-iii Of Mm-i Sub Division Of Mm/chp/btps For The Period From 01.04.2025 Or From The Actual Date Of Commencement Of Work To 31.03.2026.
Mtps I Bm Unit Iv Aoh 2025 2026 Cutting Patch Welding On The Eroded Portion Of The Fg Duct From Eco Outlet To Aph Inlet Renewal Of Support Beam Both Inlet And Outlet Of Aph Hoppers And Renewal Of Eroded Duct Support Pipes Both A And B Sides
Mtps I Mill Plant Unit Iv Dismantling And Assembling Of Coal Pipes With Bends And Releasing Bends For Reconditioning Of The Eroded Portion And Patch Welding Of Coal Bends Coal Pipes And Renewal Of Eroded Pipes Of Length At About 15Mtr Length
Applying Two Layers Of Ceramic Wear Coat Eromat At Inner Surface Of Mill Outlet Coal Bends And Patch Welding Of Punctured Damaged Portion Of Mill Outlet Coal Bends Coal Pipe Released From Coal Mills Efgh During Aoh 2025 26 Ot 30 Ceramic Wear Coat Efgh
Mtps I Mill Plant Unit Iv Dismantling Patch Welding And Assembling Of Mill Outlet Elbows Orifices Transition Pieces Fabrication Of Spool Piece Multiple Port Outlets Etc In Mill 4A To 4F During Aoh 2025 26
Mtps I Mill Plant Unit Iv Patch Welding Of Eroded Portion Of Hot Air Ducts 4A To 4F Worn Out Portion Of Hot Air Duct Joints And Providing Guard Plates For The Expansion Joint Areas Of Hot Air Ducts 4A 4B 4C During Overhaul 2025 26
Applying Two Layers Of Ceramic Wear Coat Eromat At Inner Surface Of Mill Outlet Coal Bends And Patch Welding Of Punctured Damaged Portion Of Mill Outlet Coal Bends Coal Pipe Released From Coal Mills Abc D During Aoh 2025 26 Ot 31 Ceramic Wear Coat Abcd
Nctps I Se Mi Circle Aoh 25 26 Mpm Dn Unit Ii Mills 2a 2b Dismantling And Lowering Of Mdvs Mpos Mill Outlet Elbows And Classifier Blades Patch Welding In Worn Out Portion And Dismantling Of Centre Coal Feed Pipe Type I Ii Ss Chute
Mtps 1 Bm Unit Iv Aoh 2025 26 Esp Ab Cd E And F Pass Hoppers Strengthening Of The Welding Joints Patch Welding The Eroded Portions And Other Related Works Etc