Repair And Maintenance Of Infrastructure Assets R-v Division During 2025-26. Sub Head- Maintenance And Operation Of 01 No Underground Pedestrian Walkways Hanuman Mandir, Bks Marg Under R-v. Maintenance And Operation Of 01 No Underground Pedestrian Walkways Hanuman Mandir, Bks Marg Under R-v.
Various Services Of Underground Pedestrian Walkway Under R-i Division During 2025-26 Repair And Maintenance Of Infrastructure Assets In R-i Division During 2025-26.
Bengaluru - Sampige Road Sec : Proposed Pedestrian Subways To Facilitate Crossing Of Railway Alignment By Cattle, Pedestrians And Smaller Vehicles In Various Locations As Rcc Box Size 1x5mx2.65m In Connection With Speed Increase Upto 130 Kmph (total Number Of Subways = 11 Nos) - Fabrication Of Rh Girders. Maintenance Period Is 03 Months
Bengaluru - Sampige Road Section : Sw I : Proposed Construction Of Pedestrian Subway At Km 1/300-400, Size 1x5.0x2.65m, By Air Pushing Method. Sw Ii : Proposed Construction Of Pedestrian Subway At Km 45/600-700, Size 1x5.0x3.15m, By Air Pushing Method. Maintenance Period Is 6 Months Or One Monsoon Period Whichever Is Later.
Bengaluru - Sampige Road Sec : Sw I: Proposed Construction Of Limited Height Subway At Km 63/600-700, Size: 1x5.0x3.15m By Launching Method. Sw Ii: Proposed Construction Of Pedestrian Subway At Km 67/200-300 Of Size: 1x5.0x2.65m By Launching Method. Maintenance Period Is 6 Months Or One Monsoon Period Whichever Is Later.
Bengaluru - Sampige Road Sec : Sw I : Proposed Construction Of Pedestrian Subway At Km 12/900 -13/000, Size 1x5.0x2.65m, By Launching Method. Sw Ii : Proposed Construction Of Pedestrian Subway At Km 14/300-400, Size 1x5.0x2.65m, By Launching Method. Maintenance Period Is 6 Months Or One Monsoon Period Whichever Is Later.
Modification To The Existing Ohe In Connection With Provision Of Subways For Pedestrians Or Cattle Crossing For Prevention Of Trespassing Under South East Section Between Kyn-lnl Of Mumbai Division In Central Railway
Housekeeping Services Of Vastral Pedestrian Bridge
Repair And Maintenance Of Infrastructure Assets R-v Division During 2025-26. Sub Head- Maintenance And Operation Of 01 No Underground Pedestrian Walkways Infront Of Rml Hospital Under R-v Division. Maintenance And Operation Of 01 No Underground Pedestrian Walkways Infront Of Rml Hospital Under R-v Division
Construction Of Pedestrian Path Along V5 Road Sector 44 A, B And D As Per ChandigarhMaster Plan 2031