E-tender For Allotment Of Advertisement Rights For Display Of Advertisement Through Clusters Of Unipoles /individual Unipole And Flag Signs/market Cluster Under The Jurisdiction Of Mcd. Market Cluster No. M-2/cnz At Central Market, Lajpat Nagar, 10 Meters Away From Jal Vihar Road Outer Edge And Up To 10 Meters Away From Brt Stretch I.e. Main Road, 3cs Road In Front Of 3cs Cinema On Road Side Leaving Pedestrian Way Free, At Veer Sava Open
Electrical G Works For A Extension Of Shed For Fully Bogie Frame Assembly At Bmf/budge Budge And B Construction Of Pedestrian Sub-way At Tollygunge Station In Connection With 2nd Passenger Line Between Mile 5b And New Alipore 1.67 Km. In Sealdah Division Of Eastern Railway.
Providing Paver Block Pedestrian Walk Way Handrail And Chain Link Fancing Around At Sorathur Kulam In Sorathur Panchayat In Panruti Block Under General Fund 2024-2025
Signalling And Telecom Work In Connection With Providing Prcc Pillar, Precast Rcc Panel Boundary Wall & W Beam Crash Barrier Fencing Along With Pedestrian Sub Way By Rcc Box Size 2.5 M X 2.5M 08 Nos. In Alwar-Rewari Section Of Jaipur Division.
Signalling And Telecom Work In Connection With Providing Prcc Pillar, Prcc Panel Boundary Wall, W Beam Crash Barrier Fencing And Pedestrian Sub Way By Rcc Box Of Size 2.5 M X 2.5 M Total - 14 No.S In Jaipur-Madar Section
Signalling And Telecom Work In Connection With Providing Prcc Pillar, Precast Rcc Panel Boundary Wall & W Beam Crash Barrier Fencing Along With Pedestrian Sub Way By Rcc Box Size 2.5 M X 2.5M 08 Nos. In Alwar-Rewari Section
Provision Of Pedestrian Sub Way By Rcc Box In Connection With Speed 130 Kmph Bet Rewari- Alwar- Bandikui - Bassi On Main Line B Route Total 19 Nos.
Provision Of Pedestrian Sub Way By Rcc Box In Connection With Speed 130 Kmph Bet Bassi - Jaipur - Madar Jn. On Main Line B Route Total 16 Nos.
Construction Of Pedestrian Walk Way For Missing Link Portion At Villivakkam Pond In Division 94 Zone 08
Construction Of 15 Mtr R.C.C. Pedestrian Bridge In Dhyadagar Way In Gram Sabha Jagthana Under District Plan Year 2023-24