Tender Bharat Website covers all Tenders for phenol formaldehyde resin – Including phenol formaldehyde resin Government Tenders, e Tender phenol formaldehyde resin, phenol formaldehyde resin Tenders and Private Tenders. There is no shortage of business opportunities from the largest phenol formaldehyde resin Tender Database.
Our website allows you to find phenol formaldehyde resin tenders online quickly and easily. Subscribers can also opt to receive daily tender alerts through email from TenderBharat.com to guarantee they don't miss out on any opportunities.
Supply of 1000 Foam Grade Ok-20 Or Ok- 40 Ty 6-05-1303-76.
Procurement Of 562 Mt Of Resol Type For Sru-Bhilai 310 Mt And Sru
Supply of
Supply of 486
Supply of 732000 Alkaline
Supply of Flake/Granular Type
Supply of 1086
supply of
Earth Work In Excavation Exceeding 30Cm In Depth 1.5 Mtr. In Width Or 10 Sq.M. On Plan By Mech/Manual Means Including Dressing Of Sides And Ramming Of Bottoms, Lift Upto 1.5 Mtr Including Getting Out The Excavated Soil And Disposal Of Surplus Excavated Soil As Directed, Within A Lead Of 50 Mtr. All Kinds Of Soil, Surface Dressing Of The Ground Including Removing Vegetation And In-Equalities Not Exceeding 15 Cm Deep And Disposal Of Rubbish, Lead Up To 50 M And Lift Upto 1.5M- All Kinds Of Soil, Cleaning Jungle Including Uprooting Of Rank Vegetation, Grass, Brush Wood, Trees And Sapling Of Girth Upto 30Cm. Measured At A Height Of 1 M Above Ground Level And Removal Of Rubbish Upto A Distance Of 2Km Out Side The Periphery Of The Area Cleared By Your Own Vehicle., Providing And Laying In Position Plain Cement Concrete In The Ratio 1/3/6 1 Cement/3 Coarse/6 Graded Stone Aggregates 20 Mm Nominal Size Excluding The Cost Of Centering, Shuttering And Cement San In Foundation, Footings, And Bases Of Column As Per Specifications And Drawings And Direction Of Engineer In Charge., White Washing With Lime To Give An Even Shade - New Work Three Or More Coats., Providing And Laying In Position Specified Grade Of Reinforced Cement Concrete, Excluding The Cost Of Centering, Shuttering, Finishing And Reinforcement - All Work Up To Plinth Level In The Ratio 1/2/4 1 Cement, 2 Coarse Sand, 4 Graded Stone Aggregate 20Mm Nominal Size, Providing And Laying In Position Specified Grade Of Reinforced Cement Concrete, Excluding The Cost Of Centering, Shuttering, Finishing And Reinforcement - All Work Above Plinth Level In The Ratio 1/1.5/3 1 Cement, 1.5 Coarse Sand, 3 Graded Stone Aggregate 20Mm Nominal Size, Providing And Laying For Fixing Steel Reinforcement For Reinforced Cement Concrete Work Including Transporting, Decoiling, Straightening, Cutting, Derusting Bending, Placing In Position At All Height And Binding With Binding Wire Etc. Complete As Per Drawing, Specification And Instruction Of The Engineer-In-Charge. , Brick Work With Bricks Of Class Designation 75 In Foundation And Plinth In Cement Mortar Ratio 1/6 1 Cement, 6 Coarse Sand ., Brick Work With Bricks Of Class Designation 75 In Superstructure With Cement Mortar In The Ratio 1/6 1 Cement, 6 Coarse Sand Including All Materials, Labour, Scaffolding, Racking Out Joints, Curing As Per Specification And Direction Of The Engineer-In-Charge. , 12 Mm Cement Plaster Of Mix In The Ratio1/ 6 1 Cement . 6 Coarse Sand ., Providing Neat Cement Punning About 1.5Mm Thick In Wall, Dado, Window Sills, Plinth Etc. And Like At Any Level To Anywhere As Directed And Specified By The Engineer-In-Charge., Removing Dry/Oil Bound Distemper By Scrapping And Sand Papering And Preparing The Surface Smooth Including Necessary Repairs To Scratches Etc. Complete, Removing White Or Color Wash Snowcem/Distemper By Scrapping And Sand Papering And Preparing The Surface Smooth Including Necessary Repairs To Scratches Etc. Complete., Providing And Laying For /Plastic Emulsion Of Approved Brandasian Paints/Berger-1St Quality And Manufacturer Over Two Coat Of Approved Primer After Preparation Of Surface Properly To Give An Even Shade Including Cost Of Labour And As Per Specification And Direction Of Engineer In Charge. One Or More Coat On Old Work Till Give An Even Shade., Finishing Walls With Waterproofing Cement Paint Of Approved Brand And Manufacture And Of Required Shade To Give An Even Shade.New Work Three Or More Coats, Half Brick Masonry With Bricks Of Class Designation 75 In Super Structure Above Plinth Level Upto Floor V Level.Cement Mortar In The Ratio 1/4 1 Cement, 4 Coarse Sand., Supplying And Painting With Synthetic Enamel Paint/ Aluminum Paint Of Approved Brand And Manufacture Two Or More Coats In New Work..Two Or More Coats In New Work., Demolishing Of Cement Conc. Including Disposal Of Material Within 50M Lead In The Ratio1/3/6 Or Richer Mix, Dismantling Of Old Brick Work Including Stacking Of Serviceable Material And Disposal Of Unserviceable Material Within 50M Lead.In Cement Mortar., Providing And Laying For Fixing And Sizing Of Any Sizes Of Cgi/Colour Corrugated Sheets Of 0.63Mm Thick With Ridges And Wind Tie On Roof At Any Height Including Scaffolding And Etc. All Complete As Per Instruction Of Engg.-In-Charge., Providing Reinforced By Organic Fibres And/Or Inorganic Synthetic, Fibres Cement 6 Mm Thick Corrugated Sheets As Per Is - 14871, Roofing Up To Any Pitch And Fixing With Polymer Coated J, Or L Hooks,, Bolts And Nuts 8 Mm Dia. G.I. Plain And Bitumen Washers Or With Self, Drilling Fastener And Epdm Washers Etc. Complete Excluding The, Cost Of Purlins, Rafters And Trusses, Including Cutting Sheets To Size, And Shape Wherever Required., Dismantling Of Old Plaster Or Skirting Raking Out Joints And Cleaning The Surface Of Plaster Including Disposal Of Rubbish To The Dumping Yard With 50 Mtr. Lead., Providing And Applying White Cement Based Putty Of Average Thickness1 Mm, Of Approved Brand And Manufacturer, Over The Plastered Wallsurface To Prepare The Surface Even And Smooth Complete., Providing And Laying For 40Mm Thick Cement Concrete In Flooring, In Ratio 1/2/4 1 Cement, 2 Coarse Sand, 4 Stone Aggregate Finished With A Floating Coats Of Neat Cement Including Cement Slurry, But Excluding The Cost Of Nosing Of Steps Etc. Complete Including Cost Of All Materials But Excluding Cost Of Cement., Grading Of Roof For Water Proofing Treatment With Cement Concrete In The Ratio 1/2/4 1 Cement, 2 Coarse Sand, 4 Graded Stone Aggregate 12Mm Nominal Size Mix With Sika Top Seal And Sikadur 32 In Appropriate Proportion., Providing And Laying For Fixing G.I. Pipes Complete With G.I. Fittings And Clamps, Including Cutting And Making Good The Walls Etc. Internal Work Free Of Cost- 15Mm Dia Nominal Bore, B20mm Dia Nominal Bore, Providing And Fixing Structural Steel Work Reveted, Bolted Or Welded In Built Up Sections, Trusses And Framed Work, Including Cutting Hoisting, Fixing In Position And Applying A Priming Coat Of Approved Steel Primer., Providing And Laying Hire And Labour Rate For Fixing Centering Shuttering For Concrete Works To Anywhere At Any Level Including Staging Including Strutting, Propping Etc. And Removal Of Form Or Striking Out After Completion Of Works As Directed And Specified By The Engineer-In-Charge.Material For Shuttering To Supplied By The Contractor - A Foundations, Footings, Bases Of Columns Plinth Beam Etc, B Suspended Floors, Roofs, Landings, Balconies, Shelves Etc., Providing And Laying Decorated Color Back Ground Spartek/Somany/Nitco Vitrified Ceramic Tiles Of Size 600Mm X 600Mm X 10 Mm Thick Or Any Required Tiles In Floorings, Treads Do Etc. Laid On A Bed Of 10Mm Thick Cement Mortar In The Ratio 1/3 1 Cement, 3 Coarse Sand Finishing With Flush Painting In White/Color Cement As Required., Providing & Fixing For Laying Chequred Precast Concrete Portico Tiles Of Size 300Mm X 300Mm Durastone Heavy Duty Vitrified Tiles Of Color Back Ground Make-Endura/Somany Of Size As Required In Footpath And Courtyard, Etc. Laid On A Bed Of 20Mm Thick Cement Mortar In The Ratio1/4 1 Cement, 4 Coarse Sand Finishing With Flush Pointing In White/Color Cement As Required., Providing And Laying For Laying Decorated Colour Back Ground Ceramic Tiles Of Reqd. Size In Wall/Floor Laid On 10Mm Thick Cement Mortar In The Ratio 1/3 1 Cement, 3 Coarse Sand Finishing With Flush Painting In White/ Color Cement As Required. Tiles Should Be Standard Quality Of Spartek/Somany., Providing And Laying For Finishing Walls With Advanced Anti Alagal Weather Proof Emulsion Paint Brand-Apex Ultima Make-Asian Paints Approved Brand And Manufacture And Of Required Shade To Give An Even Shade Over 2Two Coats Professional Primerwater Thinnablemake-Asian Paints E7. Consumption Rate2.50Litre/ Sq.M.New Work Three Or More Coats, Providing And Fixing Factory Made Solid Core, Commercial Flush Door Shutters Non-Decorative Type, Core Of Block Board Construction With Well Seasoned Chemically Treated Timber Of Moisture Content, Not Exceeding 12 Per Cent And Side Styles, Top And Bottom Rails Of Main Width As Per I.S. Code, Well Seasoned Hard Wood Chemically Treated And Well Matched Commercial Ply Veneering With Vertical Grains On Cross Bends On Both Faces Of Shutters, Hot Pressed And Banded With
Supply of