Construction Of Goomties At Lc 20 Between Km 23/000-100. Sw Ii : Construction Of Rcc Drain For A Length Of 2160M In Connection With The Work Of Bengaluru -Sampige Road And Bangalore - Dharmavaram Sec: Through Turnout Renewal Ttr Of Existing Curved Switch And Cms Crossing With 60 Kg Tws And 60 Kg Weldable Crossing - 1In12 - Total : 48 Nos In Sbc-Spgr Section In Aden/Yeswanthpur Section And Through Ballast Recoupment Tbr Of Points And Crossings - 13 Nos 5 Nos In Nidavanda Ndv, 4 Nos In Thondebhavi Tdv And 4 Nos In Gauribidanur Gbd Yards In Sbc-Spgr And Sbc-Dmm Section. Sw Iii : Yelahanka - Bangarpet Section :1. Improvements To Rub No. 239A, 237A, 231A, 234A, 228A 5 Rubs Works Such As Road, Collection Well, Drainage Pipeline Etc., 2. Proposed Improvements To Rub No. 203B, 200A, 197A, 196A, 182A, 181B, 178A, 174A, 170A, 166A, 164A, 161A, 156A, 155A, 152A And 139A 16 Rubs Works Such As Approach Road, Drainage Pipeline, Epoxy Grouting And Retaining Wall In Aden/Ypr Section Total 21 Rubs. Maintenance Period Is 6 Months
Construction Of Foundations, Cable Trench, Oil Sump Pipeline, Fp Wall, Gp2 Grouting, Anti Weeding, Pcc & Metal Spreading In Switch Yard & Misc. Civil Works At 220 Kv Mesanka Gariyadhar S/S & 220 Kv Shelavadar Talaja Ss