(1)provision Of Guard Rail & Check Rail On Curves In The Jurisdiction Of Aden/cwa, (2)various Type Of Track Related Works Like Overhauling Of Track, Boxing And Dressing Ballast, Cleaning Of Side Drain And Other Allied P Way Works In The Jurisdiction Of Den/north/ngp.(3)renewal Of Grsp Of Point And Crossing 60kg 1 In12 & 1 In 8.5 Un Der The Jurisdiction Of Den/north/ngp,(4)renewal Of 1 In 12 Turnout With 1 In 16 At Pnj,grg & Kge Yard (04 Nos.) And Elimination Of Defects Of Crossover At Gggs Yard And Non Design Curve Under The Jurisdiction Of Den/n/ngp & (5) Shifting Of Existing Point No.71,72b(1 In 8.5 60 Kg Curved Switch & Point No.74a,74b(1 In 12) 60 Kg C/switch To Reduce Degree Of More Than 8 Degree Sharp Curve At Cwa Yard Under Aden/cwa.
Laying And Linking Of Bg Track For Main Line, Loop / Siding Lines And Point & Crossing Etc. In Station/yards, Transportation Of P. Way Materials, Dismantling Of Existing Track, Welding Of Rails, Through Rail Renewal Including Supply & Spreading Of Machine Crushed Stone Ballast, Earthwork & Blanketing In Embankment / Cutting In Formation And Other Incidental Miscellaneous Works At Ujjain Yard In Connection With; (1) Ujjain - Provision In Stabling Line In Nc Yard In Connection With Simhastha - 2028. (2) Provision Of Stabling Line And Relocation Of Pqrs Siding In Loco Yard In Connection With Simhastha - 2028.
Maintenance Of Greenery From Paddapukur Bus Stand To Park Circus Seven Point Crossing Under Borough Vi, K.M.C. Ward No.60 Vi/060/036/2025-2026/R
Installation Of Minimast Lighting System At Different Crossing Point Of Roads In Ward No.-86 Under Br.-Viii. Kmc/Ltg/Z-Iii/2025-2026/831
Modification Work Of 220Kv S/C Rtgh-Jjn Tr. Line Bw Loc No. 342 And 343 At Railway Track Crossing Between Railway Tp Point 316/9 And 317/0 Of Ratagarh-Churu Section As Deposit Work Of Ms. Railway Mlin/22.13 On Labour Rate Contract Basis
Modification Work Of 132kv S/c Hisar Sadulpur Tr. Line Bw Loc No. 328 And 329 At Railway Track Crossing Between Railway Tp Point 171/3 And 171/4 Of Hmg-sdlp Section As Deposit Work Of Ms. Railway Mlin/22.14 On Labour Rate Contract Basis
Construction Of Pre Mix Carpet Seal Coat On Existing Concrete Road From Mecheda Central Bus Stand Ghumti Towards Mecheda Five Point Crossing In The Area Of Santipur I Gp Under Sahid Matangini Development Block
Drawing Of Lighting Overhead Line 2 Ph 230 V P-P, 4 Wire From 11Kv Main Substation To Four Point Crossing For Mine Illumination At Gourangdi A Ocp Under Salanpur Area.
Installation Of Minimast Light At Different Crossing Point Of 25/2 Rowland Road In Ward No. - 69
(1)casual Renewal Of Rails Under The Jurisdiction Of Sse/p-way/bxa(2.0kms) (2) Through Sleeper Renewal (primary) For 2.01 Kms Between Gdz-lbo Under Jurisdiction Of Aden/ii/bia (3) Through Sleeper Renewal(p) For 6.074 Kms Between Durg-drz Section (4) Deep Screening Of Point & Crossing By Machine For 29 Sets Between Durg-drz Section Under The Jurisdiction Of Aden/ii/bia (5) Renewal Of Sej 37 Sets Between Durg-taroki And Renewal Of Glued Joints 66 Sets Between Durg- Taroki.