Construction Of Preparatory Of Epi Stopping At E9 Tg And Bg Of Xvib Seam 500mh At Moonidih Colliery W.j Area
Making Of 18 Eighteen Nos. Of Isolation Stopping And 2 Two Nos. Of Preparatory Stopping For Proposed Depillaring Panel O In 4, 5, 6, Incline And Panel L In 7and8 Incline Of Dhorik Colliery .
Construction Of Isolation / Sealing Of Preparatory Stopping At Surakachhar 3and4 Incline.
Construction Of 03 Three Nos. Preparatory Sectionalization Stopping In Between 57-58D From 4Rl To 2Rl In Kenda Bottom Seam Of Kunustoria Colliery Under Kunustoria Area
Construction Of 14 Nos. Rcc Isolation Stopping And 06 Nos. Preparatory Isolation Stoppings In Proposed Contiguous Depillaring Panel Seam-Ii And Seam-Iii In Underground At Pandavpara Mine.
Construction Of 8 Nos. Of Isolation Stoppings And 5 Nos. Preparatory Isolation Stopping For Proposed Panel-20 At R-Viiiborachak Seam Of Patmohona Colliery
Making Of 14 Fourteen Nos. Of Isolation Stopping And 2 Two Nos. Preparatory Stopping For Proposed Depillaring Panel M In 4, 5, 6 Incline Of Dhori K Colliery
Sealing Of 4 Nos. Preparatory Isolation Stopping In 6 Dip Of 5Wl, 11El, 15El, 16El In Bansgarha Seam Of Bhurkunda B Colliery.
Construction Of 8 Nos. Of Isolation Stoppings And 5 Nos. Preparatory Isolation Stopping For Proposed Panel-20 At R-Viiiborachak Seam Of Patmohona Colliery
Sealing Of 04Four No. Preparatory Stopping To Isolate The Depillaring Panel 12B At Parbelia Colliery Hijulir-Viii Seam Working