Gem Bids For Selection Of Laboratories For Testing Of Products/material - External Quality Assessment System Eqas For Accuracy And Reliability Of Test; Buyer To Use Custom Filter To Input Technical Specification Of The Product/material So That Service Provider Ma
Gem Bids For Group-1 Total Lump Sum Price Of Smaw Equipment-04 Nos (02 Nos. In Talcher Project And 02 Nos. In Lara Project) And Gtaw Equipment -04 Nos (02 Nos. In Talcher Project And 02 Nos. In Lara Project) Along With All Accessories Including Freight And Gst Group-1- Stay At Site Including Lodging, Boarding, Local Conveyence Etc. For Supervision Of Erection And Commissioning Etc. At Site-02 Days In Talcher And 02 Days In Lara-please Refer Price Schedule Of Tender Group-1- Should Include Travel Expenses To-fro Site, Visa- Insurance-if Applicable, Intermediary Stay- For Sup Of E And C Etc At Site-01 Visit In Talcher And 01 Visit In Lara Group-2-total Lump Sum Price For Videoscope/borescope For Boiler Tube,header Inspection And Retrieval Tool-02 Nos. (01 In Talcher And 01 In Lara Project) And Video Image Scope With Measuring Facility-02 Nos. And Magnifying Glass-08 Nos. Along With All Accessories-08 Nos. (04 In Talcher And 04 In Lara Project) Please Refer Price Schedule Group-2 -total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc. For Supervision Of Erection And Commissioning Etc. At Site-02 Days In Talcher And 02 Days In Lara-please Refer Price Schedule Of Tender. Group-2 - Total Lump Sum Price For Site Visit - Should Include Travel Expenses To-fro Site, Visa- Insurance-if Applicable, Intermediary Stay- For Sup Of E And C Etc At Site-02 Visit In Talcher And 02 Visit In Lara Group-3-total Lump Sum Price For Portable X-ray Residual Stress System-02 Nos (01 Nos. In Talcher Project And 01 Nos. In Lara Project) Along With All Accessories-please Refer Price Schedule Group-3 - Total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc. For Supervision Of Erection And Commissioning Etc. At Site-02 Days In Talcher And 02 Days In Lara-please Refer Price Schedule. Group-3 - Total Lump Sum Price For Site Visit - - Should Include Travel Expenses To-fro Site, Visa- Insurance-if Applicable, Intermediary Stay- For Sup Of E And C Etc At Site-01 Visit In Talcher And 010 Visit In Lara Group-4-total Lump Sum Price For Abi (automated Ball Indentation) Tester For Mechnical Propoerties-02 Nos (01 Nos. In Talcher & 01 Nos. In Lara Project) Along With All Accessories-please Refer Price Schedule Group-4 - Total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc For Supervision Of Erection And Commissioning Etc At Site-02 Days In Talcher And 02 Days In Lara-please Refer Price Schedule Group-4 - Total Lump Sum Price For Site Visit - - Should Include Travel Expenses To-fro Site, Visa- Insurance-if Applicable, Intermediary Stay- For Sup Of E And C Etc At Site-01 Visit In Talcher And 01 Visit In Lara Group-5 - Total Lump Sum Price For Magnetic Particle Inspection Yoke Type-02 Nos (01 In Talcher And 01 In Lara), Pie Gauge For Mpi-02 Nos (01 In Talcher And 01 In Lara), Radiography Film Densitometer-02 Nos (01 In Talcher And 01 In Lara) , Uv Lamp For Fluorescent Mpi And Dpt-02 Nos (01 In Talcher And 01 In Lara) Along With All Accessories-please Refer Price Schedule Group-5 - Total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc For Supervision Of Erection And Commissioning Etc At Site-02 Days In Talcher And 02 Days In Lara-please Refer Price Schedule N Group-5 - Total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc For Supervision Of Erection And Commissioning Etc At Site-02 Days In Talcher And 02 Days In Lara-please Refer Price Schedule Group-6 -total Lump Sum Price Radiation Survey Meter-02 Nos (01 In Talcher And 01 In Lara), Personal Digital Dosimeter-04 Nos (02 In Talcher And 02 In Lara), Ultrasonic Testing Machine-conventional With Probes And Calibration Blocks-02 Nos (01 In Talcher And 01 In Lara) With All Accessories Group-6- Total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc For Supervision Of Erection And Commissioning Etc At Site-02 Days In Talcher And 02 Days In Lara Group-6 - Total Lump Sum Price For Site Visit - - Should Include Travel Expenses To-fro Site, Visa- Insurance-if Applicable, Intermediary Stay- For Sup Of E And C Etc At Site-02 Visit In Talcher And 02 Visit In Lara Group-7-total Lump Sum Price Digital Radiography-02 Nos (01 In Talcher And 01 In Lara) Along With All Accessories Group-7- Total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc For Supervision Of Erection And Commissioning Etc At Site-04 Days In Talcher And 04 Days In Lara. Please Refer Price Schedule Group-7 - Total Lump Sum Price For Site Visit - Should Include Travel Expenses To-fro Site, Visa- Insurance-if Applicable, Intermediary Stay- For Sup Of E And C Etc At Site-02 Visit In Talcher And 02 Visit In Lara.please Refer Price Schedule. Group-8- Total Lump Sum Price For Optical Microscope For Replica Interpretation,optical Microscope And Image Analysis System, Stereo Microscope With Camera Attachment-02 Nos(01 In Talcher And 01 In Lara) Alongwith All Accessories Along With All Accessories Group-8- Total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc For Supervision Of Erection And Commissioning Etc At Site-01 Days In Talcher And 01 Days In Lara Group-8- Total Lump Sum Price For Site Visit- Should Include Travel Expenses To-fro Site, Visa- Insurance-if Applicable, Intermediary Stay- For Sup Of E And C Etc At Site-02 Visit In Talcher And 02 Visit In Lara Group-9- Total Lump Sum Price-computed Radiography-cr-scanner-02 Nos-(01 In Talcher And 01 In Lara) Alongwith All Accessories Please Refer Price Schedule Group-9- Total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc For Supervision Of Erection And Commissioning Etc At Site-04 Days In Talcher And 04 Days In Lara Group-9- Total Lump Sum Price For Site Visit - Should Include Travel Expenses To-fro Site, Visa- Insurance-if Applicable, Intermediary Stay- For Sup Of E And C Etc At Site-02 Visit In Talcher And 02 Visit In Lara Group-10-total Lump Sum Price-hardness Tester -rebound Type-02 Nos (01 In Talcher And 01 In Lara) And Hardness Tester_uci Method-02 Nos-(01 In Talcher And 01 In Lara)along With All Accessories Group-10- Total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc For Supervision Of Erection And Commissioning Etc At Site-02 Days In Talcher And 02 Days In Lara Group-10- Total Lump Sum Price For Site Visit- Should Include Travel Expenses To-fro Site, Visa- Insurance-if Applicable, Intermediary Stay- For Sup Of E And C Etc At Site-01 Visit In Talcher And 01 Visit In Lara Group-11-total Lump Sum Price For Radiography Film Viewer-04 Nos (02 In Talcher And 02 In Lara), Radiography Film Samples-asme-02 Nos (01 In Talcher And 01 In Lara) , Magnetic Particles Inspection-coil Type With Cable-02 Nos (01 In Talcher And 01 In Lara), Gaussmeter For Mpi-02 Nos (01 In Talcher And 01 In Lara) , Ni-cr Panel For Dpt-02 Nos (01 In Talcher And 01 In Lara). Please Refer Price Schedule Group-11- Total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc For Supervision Of Erection And Commissioning Etc At Site-02 Days In Talcher And 02 Days In Lara Group-11- Total Lump Sum Price For Site Visit- Should Include Travel Expenses To-fro Site, Visa- Insurance-if Applicable, Intermediary Stay- For Sup Of E And C Etc At Site-01 Visit In Talcher And 01 Visit In Lara Group-12-total Lump Sum Price For Hardness Tester-02 Nos (01 In Talcher And 01 In Lara), Exfoliation Meter For Ss Tubes-02 Nos (01 In Talcher And 01 In Lara), Thermography Camera-02 Nos (01 In Talcher And 01 In Lara), Holiday Detector-02 Nos (01 In Talcher And 01 In Lara), Engineering Stethoscope-02 Nos (01 In Talcher And 01 In Lara), Portable Vibration Meter-02 Nos (01 In Talcher And 01 In Lara), Comparator-02 Nos (01 In Talcher And 01 In Lara), Surface Roughness Meter-02 Nos (01 In Talcher And 01 In Lara), Spirit Level-04 Nos (02 In Talcher And 02 In Lara), Noise Level Meter-02 Nos(01 In Talcher And 01 In Lara), Torgue Wrench-02 Set (01 In Talcher And 01 In Lara), Pressure Gauge-04 Nos (02 In Talcher And 02 In Lara), Mercury Thermometer-04 Nos (02 In Talcher And 02 In Lara), Infrared Thermometer-02 Nos (01 In Talcher And 01 In Lara), Digital Thermometer _n-contact_-02 Nos(01 In Talcher And 01 In Lara), Digital Thermometer Contact-type-02 Nos(01 In Talcher And 01 In Lara),thermocouple Test-4 Nos(02 In Talcher And 02 In Lara), Barometer -aneroid-08 Nos(04 In Talcher And 04 In Lara), Mameter-test And U Tube-02 Nos (01 In Talcher And 01 In Lara),hygrometer-02 Nos (01 In Talcher And 01 In Lara) Along With All Accessories Group-12-total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc For Supervision Of Erection And Commissioning Etc At Site-10 Days In Talcher And 10 Days In Lara Group-12-total Lump Sum Price For Site Visit - Should Include Travel Expenses To-fro Site, Visa- Insurance-if Applicable, Intermediary Stay- For Sup Of E And C Etc At Site-02 Visit In Talcher And 02 Visit In Lara Group-13-total Lump Sum Price For Replica Kit For In-situ Metallography-02 Nos (01 In Talcher And 01 In Lara), Sample Preparation Tools_machines-02 Set(01 In Talcher And 01 In Lara), In-situ Metallogrpahy Kit-grinder And Polisher With Accessories-02 Set(01 In Talcher And 01 In Lara) Along With All Accessories Group-13- Total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc For Supervision Of Erection And Commissioning Etc At Site-06 Days In Talcher And 06 Days In Lara Group-13- Total Lump Sum Price For Site Visit- Should Include Travel Expenses To-fro Site, Visa- Insurance-if Applicable, Intermediary Stay- For Sup Of E And C Etc At Site-02 Visit In Talcher And 02 Visit In Lara Group-14-total Lump Sum Price For Mcf_magnetic Stauroscope_for Assessment Of Quality Of Pwht-02 Nos, Argon Purity Tester-02 Nos(01 In Talcher And 01 In Lara), Inspector Kit For Welding Inspection-02 Nos(01 In Talcher And 01 In Lara),temperature Gun-02 Nos(01 In Talcher And 01 In Lara) Along With All Accessories Group-14- Total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc For Supervision Of Erection And Commissioning Etc At Site-04 Days In Talcher And 04 Days In Lara Group-14- Site Visit -should Include Travel Expenses To-fro Site, Visa- Insurance-if Applicable, Intermediary Stay- For Sup Of E And C Etc At Site-02 Visit In Talcher And 02 Visit In Lara Group-15-total Lump Sum Price For Binoculars-04 Nos(02 In Talcher And 02 In Lara), Laser Alignment Kit With Target Kit-02 Nos(01 In Talcher And 01 In Lara), Along With All Accessories Group-15-total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc For Supervision Of Erection And Commissioning Etc At Site-02 Days In Talcher And 02 Days In Lara Group-15- Total Lump Sum Price For Site Visit -should Include Travel Expenses To-fro Site, Visa- Insurance-if Applicable, Intermediary Stay- For Sup Of E And C Etc At Site-01 Visit In Talcher And 01 Visit In Lara Group-16-total Lump Sum Price For Remote Field Eddy Current Testing_advance Electro Magnetic Testing-02 Nos (01 In Talcher And 01 In Lara), Along With All Accessories Group-16-total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc For Supervision Of Erection And Commissioning Etc At Site-02 Days In Talcher And 02 Days In Lara Group-16-total Lump Sum Price For Site Visit -should Include Travel Expenses To-fro Site, Visa- Insurance-if Applicable, Intermediary Stay- For Sup Of E And C Etc At Site-01 Visit In Talcher And 01 Visit In Lara Group-17-total Lump Sum Price For Helium Leak Detector-02 Nos(01 In Talcher And 01 In Lara) Along With All Accessories Group-17-total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc For Supervision Of Erection And Commissioning Etc At Site-02 Days In Talcher And 02 Days In Lara Group-17- Site Visit - - Should Include Travel Expenses To-fro Site, Visa- Insurance-if Applicable, Intermediary Stay- For Sup Of E And C Etc At Site-01 Visit In Talcher And 01 Visit In Lara Group-18-total Lump Sum Price For Oxide Measurement For Boiler Tubes-02 Nos (01 In Talcher And 01 In Lara) Along With All Accessories Group-18-total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc For Supervision Of Erection And Commissioning Etc At Site-02 Days In Talcher And 02 Days In Lara Group-18-total Lump Sum Price For Site Visit - Should Include Travel Expenses To-fro Site, Visa- Insurance-if Applicable, Intermediary Stay- For Sup Of E And C Etc At Site-01 Visit In Talcher And 01 Visit In Lara Group-19-total Lump Sum Price For Ultrasonic Thickness Meter_d-meter-digital-04 Nos (02 In Talcher And 02 In Lara), Vernier 300 Mm Scale-04 Nos (02 In Talcher And 02 In Lara),vernier 600 Mm Scale-04 Nos (02 In Talcher And 02 In Lara), Outside Micrometre-04 Nos (02 In Talcher And 02 In Lara), Inside Micrometer 25-750_dial-04 Nos (02 In Talcher And 02 In Lara), Measuring Tape-04 Nos (02 In Talcher And 02 In Lara), Paint Thickness Meter_elcometer-ultrasonic Digital-02 Nos (01 In Talcher And 01 In Lara), Paint Adhesion Testing Kit-02 Nos(01 In Talcher And 01 In Lara),internal Oxide Scale Measuring System With Probe_utbased-02 Nos(01 In Talcher And 01 In Lara) Along With All Accessories Group-19- Total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc For Supervision Of Erection And Commissioning Etc At Site-04 Days In Talcher And 04 Days In Lara Group-19-total Lump Sum Price For Site Visit- Should Include Travel Expenses To-fro Site, Visa- Insurance-if Applicable, Intermediary Stay- For Sup Of E And C Etc At Site-01 Visit In Talcher And 01 Visit In Lara Group-20-total Lump Sum Price For Welding Simulator-02 Nos (01 In Talcher And 01 In Lara) Along With All Accessories Group-20-total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc For Supervision Of Erection And Commissioning Etc At Site-02 Days In Talcher And 02 Days In Lara Group-20-total Lump Sum Price For Site Visit -should Include Travel Expenses To-fro Site, Visa- Insurance-if Applicable, Intermediary Stay- For Sup Of E And C Etc At Site-01 Visit In Talcher And 01 Visit In Lara
Gem Bids For D-dimer Latex Agglutination Based Kit, D-dimer Reagent, D-dimer Control, Occult Blood, Esbach S Reagent, Specimen Chucks 22mm, Specimen Chucks 35mm, Havigm Elisa, Hev Igm Elisa, Levonadifloxacin 10mcg, Mupirocin 5 Mcg, Ceftaroline 30 Mcg, Urea Berthlot Endpoint, Aliquot Tubes, Serum Alp Alkaline Phosphataseestimation Kit, Serum Phosphorus Estimation Kit, Multi-parameter External Quality Assessment Scheme For Routineclinical Chemistry Investigations Cyc, Acid Alkaline Wash Forerba Fully Automated Analyzer 360, Serum Sgptestimation Kit Based On Ifcc Optimised Uv Kinetic Method, Serum Creatinine Estimation Kit Based On Jaffe S Method2- Point Rate Reaction, Cholinesterase, Troponin I Rapidtest
5 Percentage Enumeration Works In Teak Plantations Of Mannarappara Range 5 Percentage Enumeration Works In Teak Plantations Of Mannarappara Range In Konni Forest Division For Assessment Of Stock Site Quality And Productivity Of Teak Plantation For Formulating Future Working Plan 2025 2026
5 Percentage Enumeration Works In Teak Plantations Of Naduvathumuzhi Range In Konni Forest Division For Assessment Of Stock, Site Quality And Productivity Of Teak Plantation For Formulating Future Working Plan 2025-2026.
5 Percentage Enumeration Works In Teak Plantations Of Konni Range 5 Percentage Enumeration Works In Teak Plantations Of Konni Range In Konni Forest Division For Assessment Of Stock Site Quality And Productivity Of Teak Plantation For Formulating Future Working Plan 2025 2026
Supply And Demonstration, Instrument For Assessment Of Quality Of Concrete Using Ultrasonic Pulse Velocity Technology, Pulse Velocity Meter As Per Specification Enclosed..
Gem Bids For Custom Bid For Services - Engagement Of Supervisingagency For Day To Day Supervision Of Pipeline Constructionfor Quality Surveillance And Conformity Assessment In Kgplproject Group A Gujarat, Custom Bid For Services -engagement Of Supervising Agency For Day To Daysupervision Of Pipeline Construction For Quality Surveillanceand Conformity Assessment In Kgpl Project Group B Mp, Custom Bid For Services - Engagement Of Supervisingagency For Day To Day Supervision Of Pipeline Constructionfor Quality Surveillance And Conformity Assessment In Kgplproject Group C Up /
Impact Assessment Of Quality Control Order Dated 2021 On Toys Bis Product Certification Scheme-1 Impact Assessment Of Quality Control Order On Toys
Gem Bids For Custom Bid For Services - Carrying Out The Assessment Of Ambient Air Quality Ambient Noise Level Stack Emission Effluent Discharge At Different Points Ground Water Level Concentration Leachate Test And & Time Weighted Average Of Coal Dust Concen..