Construction Of New Railway Siding With Proposed Feeder Line Of East Rail Corridor At Pelma, Raigarh Area Of Secl Taking Off From Bhalumuda Pelma Section Under Secr Ch 1527m 28481.542m F Ggda To Ch 1156.91m 31165.452m F Ggda About 2.7 Km
Construction Of 225 Kl Oh Tank, Pipe Line With Rail Post For Water Hydrant, Drain Cum Pathway & Other Miscellaneous Work At Bikaner East Railway Station Of Bikaner Division.
Request For Proposal Rfp For Appointment Of Detailed Design Consultant In Connection With A Rectification Of Alignment And Collapse In Tunnel 25 And Tunnel 26 From Km 89.678 At Portal 1 Of Tunnel No. 25 To Km 92.557 At Portal 2 Of Tunnel No. 26 And B Design Of New Tunnel No. 28 In Alternate Alignment: Development Of Master Plan, Design, Drawing, Methodology And Supervision During Execution, In Connection With Jiribam-imphal New Rail Line Project.
Ph 2b-a2 Architectural Finishing And Public Health Engineering Works For 6 Elevated Stations - Hebbal, Kodigehalli, Jakkur Cross, Yelahanka, Bagalur Cross Package-2 And Doddajala Package-3 In Phase 2b Line Of Bangalore Metro Rail Project.
Maintenance Of Major & Important Bridges In Balangir-Boudh Section Of Kur-Blgr New Bg Rail Line Project Under Sambalpur Division.
Composite Work For Laying And Linking Of New Bg Rail Line On Psc Sleepers, Transportation Of P Way Materials, Supply Of Ballast & Other Associated Miscellaneous P Way Works B/w Km 146.130 - Km 115.00 Of Panna -khajuraho Section Of Lalitpur Singrauli New Bg Rail Line Project.
Upgradation Of Katcha Road From Narayan Das House To Rail Line At Basulia Of Mouza- Basulia, J.l. No.-105 Of Ps No.- 22 Under Satish Samanta Gram Panchayat Within Mahishadal Development Block Under Apas Fund.
Repair Of Brick Paved Road From Paribesh Guest House To Rail Line And From Existing Concrete Road To Rail Line For A Length Of 410 M At Mouza-Narayanpur Under Kakdwip Irrigation Division I.C. With G.S. Mela-2026 Wbiw/Ee/Kidivision/E-Nit- 08 E/2025-26 Sl 5
Construction Of Station Building, Service Building, S&t Buildings, Approach Road, High Level Passenger & Rail Level Platform, Underpass, Pp/low Cost Shed, Circulating Area, Height Gauge And Other Miscellaneous Works Between Triveniganj Excl. - Jadia Incl. Section In Connection With Construction Of New Bg Rail Line Between Araria-supaul Project In Samastipur Division Of East Central Railway.
Improvement And Upgradation Of Road With Cement Concrete From Gopalpur Bostom Gore Pukurpar Towards Rail Line At Gopalpur Id-apas/01/257/156/0003