Supply And Installation Of 30 Nos Led Street Light From Rail Line To Prakash Shree Mandir, Ward No - 94, Booth No - 175, Borough - Vii, Under Amc.
Tapas Das House To Rail Line Within Suri I Block 12/Rr-2025/Bir/Wbsrda/25-26-44
1Installation Of Solar Light Infront The House Of Paresh Mandal At Ramchandrapur.2Installation Of Solar Light Infront The House Of Moksedur Miya At Ramchandrapur Rail Line Para 3Installation Of Solar Light Infront The House Of Baidul Miya At Ramch 665/Dam/25, Dated-04/11/2025 Sl No-16
Pilling Near House Of Prahllad Sarkar, Construction Of Gardwall And Sitting Area At Kapali Para Kali Mandir, Construction Of Cc Road From House Of Kanchan Debsharma To Cc Road , Repairing Of Cc Road From Pakka Road To Rail Line, Under Belbari-1 Gr
Construction Of Drain With Cover From The House Of Maharul To Old Rail Line At Jorpukuria Village Jafarganj Mouza Under Bahadurpur Gram Panchayat Of 15Th Cfc Fy-2025-26 Scheme Id120477471
Construction Of Station Buildings, Platforms, Fobs, Circulating Area Amenities And Other Misc. Yard Structures Along With General Electrical Works In Devprayag (km - 47+390), Janasu (km - 62+220), Maletha (km - 66+970) And Srinagar (km-72+148) Yards In Connection With Rishikesh - Karnprayag 125km Long New Bg Rail Line Project In The State Of Uttarakhand, India.
Augmentation Of Existing 11/0.433 Kv Sub-station Including Supply, Installation, Testing & Commissioning Of 02 Nos.1mva Power Transformers, Lt & Ht Panels, Laying Of Ht & Lt Cables And Other Associated Works Including Heavy Repair Of Existing Substation Building At Drm Office Moradabad In Connection With New Mtcc Building At Moradabad For 125km New Bg Rail Line Between Rishikesh And Karnprayag In The State Of Uttarakhand
Construction Of Station Buildings, Platforms, Fobs, Circulating Area Amenities And Other Misc. Yard Structures Along With General Electrical Works In Karanprayag Yard (km - 124+990) In Connection With Rishikesh - Karnprayag 125km Long New Bg Rail Line Project In The State Of Uttarakhand, India.
Ultrasonic Flaw Detectors Testing (main Line) Of Rail, Sej & Turnout And At Welds Over Bikaner Division Under Jurisdiction Of Aden/line/bikaner.
Request For Proposal For Appointment Of Detailed Design And Supervision Of: (a) Tunnel No. 23a, Tunnel No. 25, And Tunnel No. 26 : Balance Work, (b) Tunnel No. 12 : Balance Work, And (c) Tunnel No. 28 In Alternate Alignment; In Connection With Jiribam-imphal New Rail Line Project.