Open E-tender For Different Type Of Track Activity Like Casual Renewal Of Rail- Sleeper-switch-sej, Tamping Of Track, Deep Screening, Casual Renewal Of Fittings, Assisting Track Machine Etc. With Other Ancillary Works And Cleaning Of Drainage System Of Hansdiha-dumka (ex) (sl 73/717-115/375), Kakni (ex)- Hansdiha (sl 35.4 - 38.11) And Hansdiha-godda (sl 0/0-32/500) In The Section Of Senior Section Engineer/ P. Way/bhagalpur-ii Under Assistant Engineer/bhagalpur In The Jurisdiction Of Senior Divisional Engineer/ii/malda.
Open E-tender For Different Type Of Track Activity Like Casual Renewal Of Rail- Sleeper-switch-sej-fittings, Tamping Of Track, Deep Screening, Assisting Track Machine Etc. With Other Ancillary Works And Cleaning Of Drainage System Of Barahat (excluding)-banka (km 37/840-53/500), Barahat (excluding)- Hasdiha Single Line (km 37/620- 73/717) In The Section Of Senior Section Engineer/p. Way/bhagalpur-ii Under Assistant Engineer/ Bhagalpur In The Jurisdiction Of Senior Divisional Engineer-ii/malda.
Samakhiali- Gandhidham- Kandla Port & Gandhidham-bhuj- Tfr-140.408 Tkm, Gandhidham- New Bhuj-trr(p)-14.602 Tkm To Eliminate 52 Kg D-mark Rail And Casual Rail Renewal Under Aden-gandhidham.
Execution Of Through Rail Renewal For A Length Of 5.54 Kms In Different Patches Under The Jurisdiction Of Sr.den(east) Of Khurda Road Division.
Renewal Of Seized Plate/rail Screw, Reconditioning Of Built Up Crossing, Broken Slide Chairs, Wornout Mci Insert And Fabricating & Fixing Of Check Rails Under Aden(t) By Jurisdiction
Through Rail Renewal (p) For 9.279 Tkm, Through Ballast Renewal In Track For 18.514 Tkm , Through Ballast Renewal Of Turnout 10 Nos. , Renewal Of Cms Crossing 1 In 8.5-7 Sets & 1 In 12-12 Sets , Turnout Fastening Renewal 1 In 12 & 1 In 8.5 , Tfr(metal Liner)- 5.5 Tkm And Tfr(grsp Renewal)-30.549 Tkm , Tbr(t/o)- 32 Sets, Tws+wcms (1 In 12)- 13 Sets, Tws+wcms (1 In 8.5)- 2 Sets, Ttr(tsr)(1 In 12)- 12 Sets, Ttr(tsr)(1 In 8.5)- 11 Sets, Ttr(tsr)(ds)- 2 Sets,ttr(tws)(1 In 12)- 23 Sets, Ttr(tws)(1 In 8.5)- 2 Sets Under The Jurisdiction Of Den East Adra.
Name Of The Work: Gnt Division: 1.through Rail Renewal(p)-3.227 Kms - Electrical Trd Arrangements (pwp 2025-26 Of 31025) 2.(a) Guntur Division: Ctr(p) - 5.541 Km- Electrical Trd Arrangements (pwp 2025-26 Of 31028 A) (b) Through Rail Renewal(p)-11.814 Kms - Electrical Trd Arrangements (pwp 2025-26 Of 31028 B) 3.through Rail Renewal(p)-7.376 Kms - Electrical Trd Arrangements (pwp 2025-26 Of 31029) 4.guntur Division: Ctr(p) - 6.12 Km- Electrical Trd Arrangements (pwp 2025-26 Of 31048) 5.guntur Division: Ctr(p) - 10.262 Km- Electrical Trd Arrangements (pwp 2025-26 Of 31049) 6.(a) Guntur Division: Tfr- 30.435 Km- Electrical Trd Arrangements (pwp 2025-26 Of 31088 A) (b) Guntur Division: Fs+tws+wcmsc 12 Set- Electrical Trd Arrangements (pwp 2025-26 Of 31088 B) 7. Guntur Division: Tbr (ml) 21.347 Km- Electrical Trd Arrangements (pwp 2025- 26 Of 31089) In Den/north Section And 1.through Rail Renewal(p)-2.746 Kms - Electrical Trd Arrangements (pwp 2025-26 Of 31024) 2.guntur Division: Ctr(p) - 11.088 Km- Electrical Trd Arrangements (pwp 2025-26 Of 31026) 3.guntur Division: Ctr(p) - 16.489 Km- Electrical Trd Arrangements (pwp 2025-26 Of 31027) 4.guntur Division: Ctr(p) - 19.771 Km- Electrical Trd Arrangements (pwp 2025-26 Of 31047) 5.(a) Guntur Division: Tbr - 26.36 Km- Electrical Trd Arrangements (pwp 2025-26 Of 31087 A) (b) Guntur Division: Fs+tws+wcmsc 31 Sets- Electrical Trd Arrangements (pwp 2025-26 Of 31087 B) 6. (a) Guntur Division: Tfr - 9.166 Km- Electrical Trd Arrangements (pwp 2025-26 Of 31090 A) (b) Guntur Division: Fs+tws+wcmsc 6 Set- Electrical Trd Arrangements (pwp 2025-26 Of 31087 B) In Den/west Section.
Track Renewal Work Against Sanctioned Work Of Rajkot - Jetalsar Section - Trr(p) 5.320 Tkm (2) Bhavnagar Division : Casual Renewal Of Rail 2.00 Kms Under Sr.den(c) Jurisdiction.
Tender For Ctr(p) In Patches In Dn Line For A Length Of 10.4 Tkm. Sw-ii: Gadag-hotagi Section-trr(p)-40.9 Tkm (d-mark Rail Renewal) In Patches In Nimbal-hotagi Section. Sw-iii: Gadag-hotagi Section-trr(p)- 31.3 Tkm In Patches In Bijapur-nimbal Section(
Execution Of Signaling & Telecommunication Work In Connection With: (1) Provision Of Msdac Parallel To Dc Track Circuits In Main Line Of Raipur Division, (2) Construction Of New Shunting Neck At Maroda, (3) [balance Work] Bilaspur - Durg - Through Rail Renewal