Supply, Installation And Commissioning Of Rake Test Rig, As Per Rdso Sketch No.81110 Of Rdso Pamphlet No. C-8805, The Test Rig Shall Be Capable Of Testing Rakes Of Coaches With Twin Pipe Air Brake System. The Scope Of Supply Shall Consist Of Following Items As Per Rdso Sketch: A Filter- 01 Nos, B Angle Cock - 02 Nos, C Brake Hose Coupling Bp- 02 Nos, D Single Pressure Gauge 6 - 03 Nos, E Drivers Brake Valve - 01 No, F Relay Valve Du-22 :- 01 No, G Feed Valve F-2 :- 01 No, H Isolating Cock - 03 Nos, I Brake Hose Coupling Fp - 01 No, J Equalizing Reservoir 9l - 01 No. Make- Escort, Sswaha, Or Similar.
Supply Of Spares For Preventive Maintenance And Servicing Of Single Wagon Test Rig/ Rake Test Rig.
Supply Of Automatic & Computerized Rake Test Rig For Wagons With Twin Pipe Air Brake System As Per Technical Specification Attached At Annexure-a.
Supply Of Rake Test Rig Of Coaches For Air Brake System.
Supply Of Rake Test Rig.
Supply Of Automated Scada Based Computerized Full Rake Test Rig For Icf & Lhb Coaches Specification Attached.
Supply, Installation & Commissioning Of Automatic And Computerized Rake Test Rig.
Supply Of Provision, Fixing, Testing And Commissio Provision, Fixing, Testing And Commissioning Of Air Pipe Line Working Pressure 8 To 10 Kg /sq Cm Between Rake Test Rig And Coach.
Supply, Installation & Commissioning Of Automatic And Computerized Rake Test Rig..
Supply Of Rake Test Rig Rtr.