Construction Of Temporary Structure At Roof Of Existing Civil Engineering Building, New Degree Campus Of Tit, During The Year 2025-26 /Sh Construction Of Rcc, Brick Work, Tiles Work, Aluminium Works, Gci Sheet, Pipeline, Toilet Etc.
Construction Of Damaged Boundary Wall, Footpath Along Sec-5 Market And Opposite Side Drain And Footpath From Qtr. No. 1154 To Qtr. No. 1183 Sec-5 Rk Puram By Pdg. Brick Work, Rcc Items, Tiles, Precast Rcc Slab/ Gratings And Grit Wash In Ward No. 152/ No.Eem-I/Sz/Tc/2025-26/56-04
Construction Of Community Toilet Block For Children Boys Girsl At Ekta Vihar Camp Sec-6 R.K. Puram By Pdg. Brick Work, Rcc Items, Steel Work, Tiles, Distempering, Paint And Sanitary Items In Ward No. 152/Sz No Ee-Ms-I/Sz/Tc/2025-26/54-10
Repair Of Interlocing Tiles/cc/roadgully/ Junglas/rcc Slab And Pvc Pipe Ward No 15 To 29
Repair Of Interlocing Tiles/cc/roadgully/ Junglas/rcc Slab And Pvc Pipe Ward No 01 To 14
The Work Includes Foundation Work, Brick Work, Cement Cencrete Work, Rcc Work, Steel Work, Tiles Work, Aluminum Work, False Ceiling Etc. Extension Of Existing Shed For Sitting Room Cabin For Hydrogen Generation Lab Civil
Repair Of Interlocing Tiles/Cc/Roadgully/Junglas/Rcc Slab And Pvc Pipe Ward No 15 To 29 Mc Gurdaspur
Repair Of Interlocing Tiles/Cc/Roadgully/Junglas/Rcc Slab And Pvc Pipe Ward No 01 To 14 Mc Gurdaspur
Boq Safety And Upgradation Of Electric Store Ed Udhampur- Laying Of Rcc Floor Paver Tiles, Construction Of Boundary Wall, Watchman Room Including Repair Of Sheds And Installation Of Cctv At Shiv Nagar Divisional Store Ed Udhampur Under Ut Capex Budget.
End To End Paving By Pdg Rmc Rcc Brick Work Plaster Kerb Stone Interlocking Tiles Plaster Precast Rcc Slab Etc From Krishna Hardware To Dda Road 60 Foot Road Jj Colony Sector 16 In Ward 123 Kakrola Ngz To Mitigate Dust Under Ncap