Work For Construction Of Revetment Wall Of Tower No. 51 Of 220Kv Sidcul-Rishikesh Line Associated With 220Kv Substation Sidcul, Haridwar
Work For Construction Of Revetment Wall Of Tower No. 06 Of 132Kv Sidcul-Roorkee Line Associated With 220Kv Substation Sidcul, Haridwar
Constructing Revetment In Between Rd 32000-34500 Of 1r Bandh Of River Sutlej In Pragpur Complex To Save Village Abadies And C/land Of Village Pragpur
Improvement Works For Yard Formation With Brick Revetment Walls With Allied Civil Works Of The Substation Premises At 33/11 Kv Srivaikundam Ss.
Fdr Protection Of Fatikcherra Right Bank At Ward No 04 Under Radhanagar Gp Under W.R Sub-Division Kumarghat During The Year 2025 26Sh Bank Revetment Work By Placing Sand Cement Block For A Length Of 45.00 Mtr.
River Erosion Mitigation By Providing And Repair Of Revetment And Spurs To Protect Culturable Land Village Daria Mussa On Rd 66600 On Left Side Of River Ravi Damaged Druing Floods Of 2025 In Tehsil Ajnala,
River Erosion Mitigation By Bringing To The Design Section Of Revetment And Studs For Protection Of Bop Kot Razada Opposite Rd 8000 For Advance Bundh On R/s Os River Ravi Damaged During Floods 2025-26 Bop Kot Razada, Tehsil Ajnala
River Mitigation By Repair, Restoration And Bringing To Design Section Stud And Revetment Opposite Rd 87000 Of Main Fpe To Save Launch Pad Of Pantoon Brigde On Left Side Of River Ravi Damaged During Floods Of 2025 In Village Kot Razada, Tehsil Ajnala
Anti Erosion Measures With Boulder Revetment Work On The Bank Of Turkunijan At Village Nalana Under Ridfxxxi
Providing Revetments And Rehabilitation Of Studs/spur In Front Of Mehtabpur Bandh To Save Village Abadies Of Village Mehtabpur Along The Left Side Of The River Beas In Tehsil Mukerian, District- Hoshiarpur