Replacement Of Old Damaged A.c. Pipeline Rising Main From Source To The Existing Boosting Station, Rectification Of Insanitary Connections And Repair Of Civil Structure Of Existing Boosting Station Allika - Dnit For Improvem...
Shifting Of Rising Main Pipeline And Other Works Due Widening Of Road By Pwd Of Bagnan Zone-i Water Supply Scheme Under Chinsurah Sub-division
Interconnection Of Rising Main Pipeline With 3 Nos Pump Delivery Pipeline At Akandara Including Stability Of Rising Main Akandara To Jemua Ohr Under Augumentation Of Jemua Pwss Of Rcfa Division-i, Phe Dte.
Re-sinking Of 200mm All Through Big Dia. Tube Well, Construction Of Pump House Of Head Work Site, Augmentation Of Boundary Wall, Pump House Of 2nd Laying Of Dedicated/ Parallel Pipeline, Rising Main And Allied Works Of Araidanga Zone-ii Pwss
Operation And Maintenance Of 700/600 Mm Diameter D.i. K-9 Rising Main Chikalthana Feeder Pipeline From Wtp, Waluj To Chikalthana Gsr And 700 Mm Diameter D.i. K-9 Rising Main Pipeline From Wtp, Waluj To Twin Esr At Waluj Industrial Area
Withdraw And Relaying Of Di Pipe For Installation Of Air Valve At Chaltia Culvert, Bhakuri Culvert Khokan Mishrar More In The Clear Water Rising Main Pipeline Of Central Sector Part-ii Under Berhampore Division-i, Phe Dte. Wbphed/ee/bd-i/25-26/niet05 5
Waghodia Ugd Ii Under Sjmmsvy: Working Survey, Soil Investigation, Design Of Underground Drainage Project. Work Including Providing, Supplying, Lowering, Laying, Jointing, Testing And Commissioning Of Rcc Np3 Pipes For Sewer Collecting System - Gravity Mains And Di Pipes For Rising Main Pipeline, Construction Of Sewage Pumping Station Sps, Construction Of Sewage Treatment Plant, Supplying, Erecting, Testing & Commissioning Of Pumping Machineries At Zone Level, Construction Of Inspection Chambers & House Connection, Rcc Road, Compound Wall, Electrification Work And Sewer Cleaning Equipment Etc. For Underground Sewerage System For Waghodia Town Project, Work Including Operation And Maintenance Of 2 Years For Sewer Collecting System, And 7 Years For Sewage Treatment Plant
Shifting Of Rising Main And Distribution Pipeline With Other Allied Works Due To Widening Of Road From Digha By Pass Road Towards Alankarpur Under Digha Eastern Zone Water Supply Scheme And From Sbstc Bus Stand Towards Orissa Border For Digha Wbphed/ee/td/niet 04/2025-2026
O And M Of Distribution System And Rising Main Pipeline Ci/di/upvc Of Different Ground Based Piped Water Supply Scheme For Bablari Dewanganj, Banker Dhopadi, Gadigacha, Mahisura, Pansila, Teorkhali, Indrakpur And Adjoining Mouzas Of .... Niet Wbphe 16 Nd 25 26 Gr5