Conducting Risk Assessment With Mitigation Measures In Respect Of The Existing Cluster For Bantala Leather Complex Cluster Under The Category Tannery. Kmda/Civil/Housing/Se/C-Iv/17 Of 2025-26, Date.08.12.2025
Conducting Risk Assessment With Mitigation Measures In Respect Of The Existing Clusters For Sinthi And Boubazar Cluster Under Gem And Jewellery Category. Kmda/Civil/Housing/Se/C-Iv/16 Of 2025-26, Date.08.12.2025
Conducting Risk Assessment With Mitigation Measures In Respect Of The Existing Clusters For Santoshpur And Bodai Cluster Under Textile Dyeing Category Kmda/Civil/Housing/Se/C-Iv/15 Of 2025-26, Date.08.12.2025
Gem Bids For Custom Bid For Services - 200145630 Proposal For Lightningprotection Risk Assessment And Adequacy Study At Ntpcdadri /
Gem Bids For Ai-powered Driver Risk Assessment Of Individual
Gem Bids For Arc Flash And Risk Assessment Study Of Kamenghydro Power Station
Rfp For Selection Of Vendor For Risk Assessment And Vulnerability Analysis In The Nats 2.0 Portal Proposed Solution
Tree Health And Risk Assessment Eo A Hort Wks 109 25 26
Gem Bids For Development Of Threat Assessment And Risk Analyticssoftware Tara 3.0
Gem Bids For Custom Bid For Services - Item Code 1051934 To Conductquantitative Risk Assessment Qra Study As Per The Scope Ofwork For The Mrpl Retail Outlets Bidder Has To Quotelumpsum Price For Estimated Qty Of 400 Nos Including Gstas Per Boq