Pt For Civil Works Flooring And Drain Under Tank Wagon Gantry Area Retaining Wall And Drain Between Road And Unloading Header Areas Stone Pitching Retaining Wall Near Tank Wagon Pump House Paver Road In Scrap Yard, Painting Area Development Site Cl
Dismantling And Re Installing Laying-Fitting Of 60Lbs And 30 Lbs Track Line In 9Thrise, D-18 Bg, D16 Bg And Between D-16 B G To D-18 Bg. For Marching Of Road Header From D-18 Panel To E-7 Panel Of Xvi B Seam Of Moonidih Colliery, W J Area
Drivage Of 02 Nos. Underground Stone Drift By Hiring Of Road Header For High Speed Mechanized Drivage Of Drifts 606.20Mx5.0Mx3.0M And 515.05Mx5.0Mx3.0M Meter Length And Interconnection 240Mx5.0Mx3.0M Considering 3 M Progress In One Day...
Drivage Of 02 Nos. Underground Stone Drift By Hiring Of Road Header For High Speed Mechanized Drivage Of Drifts 606.20Mx5.0Mx3.0M And 515.05Mx5.0Mx3.0M Meter Length And Interconnection 240Mx5.0Mx3.0M Considering 3 M Progress In One Day...
Request For Expression Of Interest In Invited For The Work Drivage Of A Pair Of Inclines Including Interconnection Using Road Header Or Similar Mechanized Drivage Equipment
Auction Sale Of Scrap Road Header 120 Cars
Extension Of Hydrant Points From Fire Water Header Line Up To Road In Tank Farm Area At Wrpl