Supply of Set Of Final Roof Element, As Per Drawing: Mpfredd Version 0,.
Supply Of Set Of Final Roof Element, As Per Drawing: Mpfredd Version 0,.
Supply Of Set Of Final Roof Element.
Supply of Set Of Final Roof Element.
Supply of Final Roof Element.
Supply Of Set Of Final Roof Element Complete For Lslrd & Lvph Coach..
Gem Bids For 20-4681-kanthal-dsd-rod , 20-1004-spiral -typeheating-element , 20-10011-nichrome-resistancestrips , 20-4777-kanthal-a1-resistance-strip , 20-3106- Kanthal-a1-wire , 20-2501-kanthal-a1-resistance-wire , 20-2737-kanthal-a1-resistance-wire , 20-28047-heatingelement , 20-5294-roof--heating-element , 20-28205- Heating-element
Supply of Set Of Roof Elements For Lhb Coaches., As Per Drawing: Mprooflhb, Packing Inst Ruction: 1. The Supplier Shall Pack The Final Roof Element In A Suitably Designed Returnab Le Fixture In Such A Way That Final Roof Element Shall Not Get Scratched, Damaged, Twi Sted During Transportation, Storage And Lifting And To Avoid Scratches On Outer Surf Ace. It Should Be Wrapped With Enviroment Friendly Material And It Should Have Standa Rd Clamping /Fastening Mechanism So That It Can Be Opened Easily. It Should Have Firms I Dentification Mark. 2. First Returanable Fixture Along With Final Roof Element Be Retained By Rcf & This Fixture Shall Be Exchanged In The Second Lot Supply And So On. At The End Of The Contact, The Firm Shall Collect The Remaining Returnable Packing Fixtur E From Rcf. 3. The Packing Fixture/Frame To Be Fabricated Having Sufficient Strenght To Bear Approximate 1 Tonne Load In Static & Moving Condition Of Five Coach Set Of Final R Oof Element. 4. The Fixture /Frame/Pallet Should Be Designed So That The Packed Final R Oof Element Preferably Remain In Horizontal Position To Minimize Surface Area. 5. It Sho Uld Also Be Suitable For Storage Of Final Roof Element Under Open Sky., Proction Procedur E: N.A, Quality Plan: N.A Warranty Period: 30 Months After The Date Of Delivery
Supply of Shell Kit Item For Lwaccn A One Coach Set Of Roof, Integrated 2 Mm Side Wal L With Wider Window And End Wall For Laccn Coaches. 1Integrated Sidewall Right Comp Lete To Drg.No.64514046, Col-I, Alt A-1No --- 2Roof Complete To Drg. No. 64516001, Col-I Alt C- 1 No 3Final Roof Element To Drg. No. 64516018, Col-I Alt B- 2 Nos 4Final Roof Element To Drg. No. 64516019, Col-I Alt B- 2 Nos 5Ss Rmpu Trough To Drg.No. 59316033, Col-I, Alt D -1 No 6Lhb Ac End Wall 59315007, Col-I Alt B- 2 Nos The Firm Shall Fulfill The Requirement As Per Icf/Md/Specn. 200, Issue Status-01, Rev-04 With Amendment No.1. The Fir M Shall Fulfil The Requirement As Per Icf/Md/Spec-315, Issue Status-01, Rev.00 B One Coach Set Of Body Shell Items For Laccn Coaches. 1. 64510002, Alt B - 1Nos 2. Ssa10018, Alt Nil - 4 Nos 3. 58110015, Alt A - 6 Nos 4. 58110016, Alt A - 6 Nos 5. 58110017, Alt B - 2 Nos 6. Aa G10476, Alt Nil - 4 Nos 7. Aaa10967, Alt Nil - 2 Nos 8. Aaa10963, Alt Nil - 2 Nos 9. Aaa1048 8, Alt C - 4 Nos 10.Aab10338, Alt Nil -14 Nos 11.Aad14428, Alt Nil - 3 Nos 12.Aah10191, Alt A - 2 Nos 13.Foot Step To Drg.No. Lgs/Eog-2-4-004, Alt Nil - 4 Nos C Supply And Installatio N Of Body Side Entrance Door To Drg.No. Lwscwac/Eog-5-2-001, Col-I, Alt Nil. D Underfra Me Complete For Ac 2 Tier Eog Lhb Coach To Drg.No.Lwscwac/Eog/Asr 85111001, Col.I, Al T L, - 1 No. The Manufacturing Facility As Per Icf/Md/Specn.147, Issue Status-01, Rev.02 Wit H Amendment No.1. Firm Has To Supply Roof And Sidewall Without Applying Etch Primer And The Firm Has To Apply Etch Primer On Roof And Sidewall In Icf After Shell Assembly. Special Condition : Schedu Le A- To Be Delivered To Shell Complete Shell Kit To Be Supplied With Welding Pins Welded T O Roof Assembly As Per Drawing. Schedule B- To Be Delivered To Fur Cap To Drg No 4951600 8002, Alt A And Serrated Spring Washer To Drg No 49516008003, Alt A Of Required Quantity As Per Drawing Are To Be Packed In Suitable Polythene Bags Of 100 Microns Thickness With Printed Label Wi Th Complete Details Kept Inside The Polythene Bags. Complete Details: 1. Item Description, 2. Qty In The Packing, 3. Date Of Packing, 4. Po No., 5. Type Of Coach, 6. Vendors Name & Address Polythen E Bags To Be Sealed Properly To Prevent Moisture And Water Entry. A -Packing As Per Icf /J&T/Misc-2201, Alt E Safety Instruction As Per Icf/J&T/Sk-1867, Alt. Nil -Packing As Per Icf /J&T/Sk-1809, Alt A And -Sl.No 11.B Of Note To Drawing No 645 16 024 To Be Strictly Followed. B - Pa Cking Condition As Per Icf/J&T/Sk-1865, Alt A---- C 1 Installation Required As Per Assy Drg & Annexure-A, Dtd 13-09-2023 To Be Followed. 2 Supply Rates And Installation Rates To Be Quoted Separately. Dpacking Condition As Per Drg.No.Icf/J&T/Misc-2487, Alt B. The Under Frame Should Be Supplied As Normal Side Up And Side Bearer Side Down.Safety Item Wa Rranty Period: 30 Months After The Date Of Delivery Quantity Tolerance +/-: 5 %Age, Item Category : Normal, Total Po Value Variation Permitted: Max 8 Lacs
Supply of Set Of Final Roof Element, As Per Drawing: Mp22frefacgc Version 2, Packing Inst Ruction: 1. The Supplier Shall Pack The Final Roof Element In A Suitably Designed Returnab Le Fixture In Such A Way That Final Roof Element Shall Not Get Scratched, Damaged, Twi Sted During Transportation, Storage And Lifting And To Avoid Scratches On Outer Surf Ace. It Should Be Wrapped With Enviroment Friendly Material And It Should Have Standa Rd Clamping /Fastening Mechanism So That It Can Be Opened Easily. It Should Have Firms I Dentification Mark. 2. First Returanable Fixture Along With Final Roof Element Be Retained By Rcf & This Fixture Shall Be Exchanged In The Second Lot Supply And So On. At The End Of The Contact, The Firm Shall Collect The Remaining Returnable Packing Fixtur E From Rcf. 3. The Packing Fixture/Frame To Be Fabricated Having Sufficient Strenght To Bear Approximate 1 Tonne Load In Static & Moving Condition Of Five Coach Set Of Final R Oof Element. 4. The Fixture /Frame/Pallet Should Be Designed So That The Packed Final R Oof Element Preferably Remain In Horizontal Position To Minimize Surface Area. 5. It Sho Uld Also Be Suitable For Storage Of Final Roof Element Under Open Sky. Warranty Perio D: 30 Months After The Date Of Delivery