Mtc. Of Different Pwd Roads Within Ranirbazar Section Under The Jurisdiction Of Pwdr And B, Jirania Sub Division During The Year 2025 26 Sh Grouting, Patch Carpeting, Seal Coat, Rubber Brush, Soling, Rubbish, Mix Class Bats, Gunny Bags..
Cleaning And Disposal Of Rubbish Of Drains Along C.c. Road From Gate House To Mph Building Including Storm Water Drains At Unit 5 And 6, Csctpp, Chhabra
Supply And Spreading Of Granular Material Rubbish In Different Road Jaigirghat Bye Lane, Sabuj Park, Anandanagar Kalitala, Etc. In Ward No.-125 Kmc/e.e.c/ Br-xvi/ 125/055/25-26
Silt Clearance Of 0.7mg Ugr And Cwr Of 9 Mld Wtp And Jungle Cutting, Removal Of Rubbish From Ugr Compound Within Pujali Municipal Area. 14/ee/kcmd/w And S/kmda 2nd Call Of 2025-2026 Sl No - 01
Gem Bids For Custom Bid For Services - Sweeping, Dusting, Mopping, Removal Of Cobwebs From Administrative Building Andvarious Sections Of Shed, Administrative Building Area-2, 386 Sq Mtr, Various Sections Area- 4550 Sq Mtr Total Qtyfor The Schedule Is 7567363 .., Custom Bid For Services -sweeping Of Covered Area- 92998 Sq Mtr Total Qty For Theschedule Is 87325122 Sq Mtr For 939 Days, Custom Bid Forservices - Sweeping Of Uncovered Area & Cutting Of Wildbushes Area -1636 Sq Mtr Total Qty For The Schedule Is256027 Point 74 Sq Mtr For 939 Days, Custom Bid Forservices - Cleaning Of Pit Area - 2062 Sq Mtr Total Qty Forthe Schedule Is 1936218 Sq Mtr For 939 Days, Custom Bidfor Services - Scrubbing Of Shed Floor & Pit Area -89345 Sqmtr 9th Part Of Total Area Daily, Total Area-89345 Sqmtr/9 9927 Point 22 Sq Mtr Per Day 10 Days Cycle Total Qtyfor The Schedule Is 9321659 Point 58 For 939 Days, Custombid For Services - Cleaning Of Toilets Rooms And Lavatoryrooms, Total No-41 Nos Total Qty For The Schedule Is 76998nos For 939 Days, Custom Bid For Services - Cleaning Ofurinals Total No - 26 Nos Total Qty For The Schedule Is48828 Nos For 939 Days, Custom Bid For Services -cleaning Of Sink Total No- 02 Nos Total Qty For The Scheduleis 1878 Nos For 939 Days, Custom Bid For Services -cleaning Of Hand Wash Basin And Booth, Total No- 33 Nototal Qty For The Schedule Is 30987 Nos For 939 Days, Custom Bid For Services - Collection Of Rubbish Waste Andtransportation And Disposal Of The Same At Place Nominatedby The Railway Administration-48 Mt/yr Total Qty For Theschedule Is 144 Days For 939 Days, Custom Bid For Services- Collection And Transportation Of Metallic Ferrous And Non-metallic Non-ferrous Scrap-100 Mt/year Total Qty For Theschedule Is 300 Mt For 939 Days, Custom Bid For Services -cleaning And Sludge Removal From Drainage System 444point 70 Sq Mtr Total Qty For The Schedule Is5336 Point 40sq Mtr For 939 Days, Custom Bid For Services - Collection &removal Of Iron Chips From Cnc Wheel Lath And Dump Onscrap Yard, Average Arising Of Turnings Is - 04 Mt/month Andwill Be Store At Nominated Place From The Wheel Lathe Totalqty For The Schedule Is 144 Mt Fo.
Cleaning Of Garbage, Debris, Rubbish Etc. At Different Place Of Bhowra Under E.j Area
Cleaning Rubbish, Deposited Earth And Other Materials From 3.950 Kmp. To 9.580 Kmp. Of Patipukur - Rajarhat Road Under Baguihati Highway Sub-division Under Barasat Highway Division - I, In The District Of North 24 Parganas.
Removal Of Refuse Hort. Garbage Rubbish Malba At Ssc Maintenance Of Saket Sports Complex Dda
Emergent Works Like Uprooting Of Plants, Removing Of Rubbish, Railing Of Stackyard Etc. Situated At Ghoshpara Road Under Barrackpore Sub-division - I, Pwd During The Year 2025-26. Wbpwd/ae/bkpsd I/niet15/2025-26sl 02
Repairing Pot Holes With Paver Block Over Service Road Of Street No 372 In Front Of Mani Casadona Including Cleaning Rubbish Sludge Liquid Earth Mud Etc From Adjacent Surface Drain In Action Area Iif Newtown Kolkata Wbhidco/gm E-ii/aa-ii/nit-25/2025-2026