Wss Hunder Challad Under Jal Jeevan Mission Jjm Balance Work For Construction, Testing And Commissioning Of Dug Well, Pump Room, 5000 Gph Slow Sand Filtration Plant, 20000 Gallons Sump Tank And Compound Wall Along With Allied Works
Revamping Of 0.1 Mgd Rapid Sand Filtration Plant By Way Of Replacement Of Damaged Windows, Doors, Finishing Works, Inspection And Repairs Of Electrical And Electromechanical Parts For Wss Arhama Galkhul
Construction Of 01 No. Dug Well, 01 No. Of 4000 Gph Capacity Slow Sand Filtration Plant At Mota In Wss Jakhole-a Under Jjm
Conducting Of Soil Bearing Capacity Test At 02 No. Proposed Sites Viz 1.near Bank Of River Jehlem For Intake Structures 2. Near Aiims Gate For Construction 1.2 Mgd Capacity Rapid Sand Filtration Plant For Wss Aiims Awantipora Under Ut Capex.
Maintenance Of Filtration Plants By Way Of Repairs To Various Components Of Rapid Sand Filtration Plant Vovrikhull Under M And R
Laying And Fitting Of Main Submain Distribution System At Various Spots Constt Of 020 Lac Gallons S, Pst And 0.02 Mgd Slow Sand Filtration Plant
Construction Of 01 No. Dug Well, 01 No. Of 3000 Gph Capacity Slow Sand Filtration Plant, And 10000 Glns Capacity Sump Tank
Design, construction/ successful testing & commissioning of Construction and successful testing and commissioning of 0.18 M.G.D Rapid Sand Filtration Plant comprising of Clarifloculator, Flash mixer, Filter House, back-wash tank including all Electro-Mechanical components, Supplying Fabrication, Erection and Commissioning of Structural Steel Staging, RCC foundation, roofing etc excluding SMC-GFRP Tanks for mounting of Overhead SMC-GFRP panel tank depending on safe bearing capacity, staging height and storage capacity of 0.90 Lac Gallons/410 KL, Supply and fixing installation including successful testing and commissioning along with trial run for a period of three 03 months GRP Hot Compressed Maudling SMC Sheet Moulding Compound tank for 0.90 Lac Gallons OHT on Turnkey Basis EPC Mode, Construction of Clear Water Sump 0.30 Lac Gallons, Construction of Chowkidar quarter, Construction of 06 No. Sluice chambers, Construction of Pre-Settling Tank, Construction of Pump House and Providing and Fixing of DI/GI of pipes various diameters incl pipe specials as required by norms for WSS Kachloo Khaipora under UT Capex
Construction Of 03 No. Dug Well, 02 No. Of 3000 Gph Capacity, 01 No. Of 2000 Gph Capacity Slow Sand Filtration Plant, Under Wss Theinjjm
I Design, Provision And Construction Of 10, 000 Glns Per Hour Capacity Rapid Sand Gravity Filtration Plant With Pre-Sedimentation Tank, Flash Mixture, Flocculator, Clarifier, Sludge Well Etc Including Vetting Of Design From J Ak Diqc, Testing Co