Construction Of 05 Five Nos. Sectionalization Stopping To Sectionalize The 08D/28L Dev. Dist. In Kenda R-Vi Seam Of Bansra Colliery Under Kunustoria Area
Construction Of 03 Three Nos. Preparatory Sectionalization Stopping In Between 57-58D From 4Rl To 2Rl In Kenda Bottom Seam Of Kunustoria Colliery Under Kunustoria Area
Construction Of Five 05 Nos. Sectionalization Stopping To Sectionalize 44R Dev. Dist. In Kenda R-Vi Seam Of Bansra Colliery Under Kunustoria Area
Construction Of 18 Nos Sectionalization Stopping To Sectionalize The Western Developed Part Of R-Vi Seam Along Dip-Rise From 02L/03D To 20L/03D And Level From 22Wd To 27Wd At Bhanora West Block Colliery
Construction Of 02 Nos. Rcc Sectionalization Stopping To Sectionalize Top Section Near A Pit In Kenda R-Vi Seam At Bansra Colliery Under Kunustoria Area
Repairing Of 08 Eight Nos. Sectionalization Stopping At H Zone Bot In Kenda R-Vi Seam At Bansra Colliery Under Kunustoria Area
Construction Of 02 Nos. Rcc Sectionalization Stopping To Sectionalize Top Section Near A Pit In Kenda R-Vi Seam At Bansra Colliery Under Kunustoria Area
Construction Of 14 Nos Sectionalization Stopping In 28 Sr To 33 Sr In Between 5Wl To 6Wl And 6Wl To 13Wl In Between 33 Sr And 34 Sr At South-Side Development District In Lower Kajora R-Viii Top Seam Of Central Kajora Colliery
Construction Of 04Four Nos. Sectionalization Stopping In Western Side Of Sripur R-Vi Seam Of Bejdih Colliery
Repairing Of 22 Nos Sectionalization Stopping In Rvii Seam No. 3 And 4 Pit Unit Of Shankarpur Colliery Under Bankola Area