Cleaning Of Weeds From Facultative Pond No.02 I/c Cleaning Of Grass And Surface Dressing Work At Kotra Sewage Treatment Plant Campus, Bhopal 75/25.08.2025
Pmc Services For Construction Of Road Network, Storm Water Drain, Water Supply Network, Pumping System, Utility Corridor, Main Entrance Gate, Cross Drainage Work, 26.5 Mld Sewage Treatment Plant, Rain Water Harvesting System, Common Area Lighting Wbidc/ip/haringhata/pmc/2025/1
Construction Of Road Network, Storm Water Drain, Water Supply Network, Pumping System, Utility Corridor, Main Entrance Gate, Cross Drainage Work, 26.5 Mld Sewage Treatment Plant, Rain Water Harvesting System, Common Area Lighting, High Mast Street
Provision Of Approach Road To Sewage Treatment Plant Including Protective Work At Bikram Enclave And Side Furnitureand Marking Paint For New Ch Nc Under Ge Utilities Udhampur
Construction Of Road Network, Storm Water Drain, Water Supply Network, Pumping System, Utility Corridor, Main Entrance Gate, Cross Drainage Work, 26.5 Mld Sewage Treatment Plant, Rain Water Harvesting System, Common Area Lighting, High Mast Street I Wbidc/ip/haringhata/ Construction/2025/1
Construction Of Road Network, Storm Water Drain, Water Supply Network, Pumping System, Utility Corridor, Main Entrance Gate, Cross Drainage Work, 26.5 Mld Sewage Treatment Plant, Rain Water Harvesting System, Common Area Lighting, High Mast Street I Wbidc/ip/haringhata/ Construction/2025/1
Operation And Maintenance Work Of 02 Mld Sewage Treatment Plant Based On Mbbr Technology For 5 Years At Bakh Almora
Design , Construction , Testing , Commissioning Of All The Components Of Interception And Diversion Based Sewage Treatment Plant Work Including 05 Years Of Operation And Maintenance Of The Entire System Under Sbm 2.0
Operation And Maintenance Work Of 02 Mld Sewage Treatment Plant Based On Mbbr Technology For 5 Years At Bakh Almora
Operation And Maintenance Work Of 2.0 Mld , Sewage Treatment Plant M.b.r. /a.s.p. Similar Technology