Planning, Design, Engineering, Construction, Supply, Installation And Commissioning Of Sewerage TreatmentPlant, Sewer Network And Plant Room With Operation And Maint. For 05 Yrs For Central Hospital Residential Colony Old And New On Turnkey Basis.
Design And Build Sewage TreatmentPlant Of Installed Capacity 2 Mld And All Appurtenant Structures And Allied Works, Survey, Review The Designs, Redesign Where Necessary, And Diversion Works Of Nallahs With Interception Sewer Of About 4.1 Km Length Including Survey, Design, And All Appurtenant Structures And Allied Works And Operation & Maintenance Of The Complete Works Of Sewage TreatmentPlant, Intercepting Sewer And/Or Interception & Diversion Works Of Nallahs And Pumping Stations For A Period Of 05 Years After Completion Of Works, Including Defect Liability Period Dlp Of 5 Year, Starting From The Date Of Commission Of The Project
Design And Build Sewage TreatmentPlant Of Installed Capacity 3.60 Mld And All Appurtenant Structures And Allied Works, Survey, Review The Designs, Redesign Where Necessary And Diversion Works Of Nallahs With Interception Sewer Of About 1.10 Km Length Including Survey, Design, Construction Of 2 No. Of Pumping Stations And All Appurtenant Structures And Allied Works And Operation And Maintenance Of The Complete Works Of Sewage TreatmentPlant, Intercepting Sewer And / Or Interception And Diversion Works Of Nallahs And Pumping Stations For A Period Of 05 Years After Completion Of Works, Including Defect Liability Period Of 5 Year, Starting From The Date Of Commission Of The Project C
Design And Build Sewage TreatmentPlant Of Installed Capacity 0.70 Mld And All Appurtenant Structures And Allied Works; 8- Survey, Review The Designs, Redesign Where Necessary, And Diversion Works Of Nallahs With Interception Sewer Of About 1.141 Km Length Including Survey, Design, Construction Of 1 No. Of Pumping Stations And All Appurtenant Structures And Allied Works; 9- Providing, Laying, Jointing, Testing, Commissioning Of Treated Water Pumping Main Having Length Of 50 M Of Dia 100 Mm. And Of Di K-7 Pipe From Treated Water Sump To Nearby Agriculture Land/River Including Excavation, Refilling, Road Cutting/Dismantling, Restoration, Providing Valves And Specials And Fittings All Complete. 10- Treated Water Sump With Pump House, 11- House Service Chamber, 12-Operation & Maintenance Of The Complete Works Of Sewage TreatmentPlant, Intercepting Sewer And/Or Interception & Diversion Works Of Nallahs And Pumping Stations For A Period Of 05 Years After Completion Of Works, Including Defect Liability Period Dlp Of 5 Year, Starting From The Date Of Commission Of The Project
Design And Build Sewage TreatmentPlant Of Installed Capacity 3.60 Mld And All Appurtenant Structures And Allied Works; Survey, Review The Designs, Redesign Where Necessary, And Diversion Works Of Nallahs With Interception Sewer Of About 1.10 Km Length Including Survey. Design, Construction Of 2 No. Of Pumping Stations And All Appurtenant Structures And Allied Works; And Operation & Maintenance Of The Complete Works Of Sewage TreatmentPlant, Intercepting Sewer And/Or Interception & Diversion Works Of Nallahs And Pumping Stations For A Period Of 05 Years After Completion Of Works, Including Defect Liability Period Dlp Of 5 Year, Starting From The Date Of Commission Of The Project
Interception And Diversion Of Nallahs With Stp Works Project Of Pichhore Town Under Sbm 2.0 Design, And Build Sewage TreatmentPlant Of Installed Capacity 1 Mld And All Appurtenant Structures And Allied Works, Survey Review The Designs, Redesign Where Necessary, And Diversion Works Of Nallahs With Interception Survey, Design, Of All Appurtenant Structures And Allied Works And Operation And Maintenance Of The Complete Works Sewage Of TreatmentPlant, Intercepting Sewer And / Or Interception And Diversion Work Of Nallahs And Pumping Stations For A Period Of 05 Year, Starting From The Date Of Commission Of The Project
Design And Build Sewage TreatmentPlant Of Installed Capacity 2 Mld And All Appurtenant Structures And Allied Worksoperation And Maintenance Of The Complete Works Of Sewage TreatmentPlant, Intercepting Sewer And Or Interception And Diversion Works Lquid Waest Management
Execution Of Various Civil Works In Engineering Workshop, Sabarmati: Rcc Road, Pathways, Rpf Building, Smc Lab Work, SewerTreatmentPlant Stp, Fbw Metalizing Shed, New Store/Office In New Str Shed And Mw Duty Room And Repairing Centre.