Signaling Portion Of Work In Connection With Removal Of Non Standard Layout And Provision Of Additional Loop Line On Down Direction At Veppagunta (vga) In Ajj-ru Section
Signaling Work In Connection With Provision Of Track Machine Siding At Arrakkonam, Mahendravadi, Mukundarayapuram, Latteri, Jolarpettai, Puttur Stations
Zonal Contract For The Signaling & Telecom Portion Of Work Under Adste/mas Jurisdiction Of Chennai Division For The Period Of 2 Years(2025-26 And 2026-27).
Zonal Contract For The Signaling & Telecom Portion Of Work Under Adste/tbm Jurisdiction Of Chennai Division For The Period Of 2 Years (2025-26 And 2026-27).
Zonal Contract For The Signaling & Telecom Portion Of Work Under Adste/ajj Jurisdiction Of Chennai Division For The Period Of 2 Years(2025-26 And 2026-27).
Zonal Contract For The Signaling & Telecom Portion Of Work Under Adste/spe Jurisdiction Of Chennai Division For The Period Of 2 Years (2025-26 And 2026-27).
Zonal Contract For The Signaling & Telecom Portion Of Work Under Adste/kpd Jurisdiction Of Chennai Division For The Period Of 2 Years (2025-26 And 2026-27).
&t Cable Clearance In The Yard To Facilitate The Engineering Earthwork , Yard Remodeling Work And Modification/alteration In Distributed Electronic Interlocking (m/s Hitachi Sts (formerly Known As Ansaldo Sts) Make) At Madwarani Station And New Centralized Electronic Interlocking At Saragbundia And Auto Signaling Work (ei Based) In Connection With 3rd & 4th Line Work Between Srba-mwrn In Cph-gad Section In Bilaspur Division
Various Signaling Work In Connection With:(a)provision Of Goodshed At Various Location (i)circulating Area & Road Widening At Kherwadi(ii)concrete Approach Roads To Gs-1 & Gs-2 At Lasalgaon(iii)provision Of Office, Labour & Merchant Room At Savda & Malkapur/akola/ Paras Along With Other Facility Renovation & (v)high Level Platform & Cop Development At Nashik. (b)provision Of One Common Room At Various Location Of Bhusawal Division, Two Stabling Lines In Dn Direction At Nasik Road, Development Of Track Machine Siding At Nepanagar Station, Extension Of Passenger Platform And Stabling Line At Dhule Station And Development Of Rail Grinding Machine Siding At Bhusawal Coaching Complex Yard. (c)provision Of Mridc Work:(i)rob & Lhs At Rly.km.666/07-08(ii)rob At Badnera Rly.km.662/18- 19(iii) Rub At Rly.km.545/21-22n. (d) Provision Of Rob Between New Amravati- Walgaon Stations. (e) Elimination Of Manned Lcs By Providing Subway In Lieu Of (i)lc No-13 At Kms 693.596 (ii)lc No-14 At Kms 695.764 (iii)lc No-15 At Kms 698.685 On Bd-cndb Section And (iv)lc No-17 On Badnera-narkher Section. (f)elimination Of Manned Lcs By Providing Subway In Lieu Of(i)lc No.05 On Badnera- Narkher Section (ii)lc No-12 At Kms 690.09 & (ii)lc No-11 At Kms 685.62 On Bd- Cndb Section. (g) Elimination Of Manned Lcs By Providing Subway Of Size 5.0x4.5 M By Push Through Method In Lieu Of Lc No.(1)jk-2@ Kms 538/08-09 (2)lc Nojk-5 @ Kms 543/05-06.
Signaling Related Work For Provision Of Additional Loop Line With Ei Based Centralized Operation Of Points And Signals At Pusla Station Of Nagpur Division.