Howrah Division-signalling Work In Connection With- Schedule A1-signalling Cost For Construction Of New Lhs In Lieu Of Lc Gate No. 7/c By Railway's Relieving Girder Under Aen/ndae. Schedule A2-telecommunication Cost For Construction Of New Lhs In Lieu Of Lc Gate No. 7/c By Railway's Relieving Girder Under Aen/ndae. Schedule B1-signalling Cost For Construction Of New Lhs In Lieu Of Lc Gate No. 7/1 By Railway's Relieving Girder Under Aen/ndae. Schedule B2-telecommunication Cost For Construction Of New Lhs In Lieu Of Lc Gate No. 7/1 By Railway's Relieving Girder Under Aen/ndae.
Asansol Division: Reliability Improvement And Replacement Of Signalling Gears On Age Cum Condition Basis In The Section Of Aste/asn.
Asansol Division: Reliability Improvement And Replacement Of Signalling Gears On Age Cum Condition Basis In The Section Of Aste/mdp.
Signalling Work For Strengthening Of Signalling Infrastructure In Lko-sln-zbd Section Of Lucknow Division Of Northern Railway In View Of Upcoming Inspection.
Signalling Work I.c.w. Ctr/ttr Work In The Section Of Adste/ayc Of Lucknow Division Of Northern Railways.
Signalling Works In Connection With "pch" Provision Of 01 Additional Loop Line."
Signalling Work In Connection With Safety Related Work For Improving Reliability By Providing Earthing At Various Locations In East Section Of Mumbai Division.
Signalling Work In Connection With Development Of Pit Line On Up & Dn R&d Line No. 8 & Stabling Facilities At R&d Line 6&7 For Rbpc Type Mail / Express Trains At Igatpuri Titoli Yard.
Signalling Work In Connection With Bcm Work With Geogrid And Geo-textile Method (tftr & Tbr) In Solapur Division Of Central Railway.
Signalling Works In Connection With The Engineering Works Of (1) Anand-godhra Section: Elimination Of 08 Nos. Of Level Crossings By Provision Of Road Under Bridge (lc No. 2, 10, 13, 17, 38, 48, 54a, 64) (2) Vadodara Division: Anand-godhra Section: Rebuilding Of Bridge No. 32, 35 & 51 On Anand-godhra Section. (3) Anand - Godhra Section: Elimination Of Level X-ing No.23 Between Umreth Yard (to Be Read As Between Ode And Dakor) At Km. 22/2-4 By Providing Two Lane Road Over Bridge (rob).