Through Bridge Sleeper Renewal H-Beam 3183 Nos On Various Bridges No 24, 28, 42, 43, 112, 133, 137Up & 42, 43, 112, 133Dn On Bhrl-Jat Section In The Jurisdiction Of Aden-Jat
through Sleeper Renewal Primary Tsr/p 60.21 Tkm. In Barkakana-garhwa Road Section Up By Contractors Own Pqrs Portals And Gantry In The Jurisdiction Of Sr.den/1/dhn.
I-Ms-Vm Section- Tsrp-11.755 Km - Through Sleeper Renewalp Of Existing 60Kg Sleepers With 60Kg /Psc/1660 Nos/Km Between Km. 29.52 To Km. 41.275 On Main Up Line Ii-Ms-Vm Section - Trrp- 1.472 Km With 60 Kg Rails/Lwr At Ms From Km.0.00 To Km 0.772 On Road No.8 Loop Line & From Km.0.00 To Km 0.70 On Road No.9 Loop Lineiii-Ms-Vm Section -Renewal Of Guard Rails And Guard Rail Sleepers Over Bridges And On Bridge Approaches In Various Pway Sections In Adem/Tbm Section.I Renewal Of Guard Rails Over Bridges- From Km. 1.028 To Km. 41.204 All Line Bridge No- 5A Main, 5A Up, 5A Dn, 35 A/L, 35 B/L, 35 Dn, 35 Up, 53 A/L, 53 B/L, 53 Dn, 53 Up, 116 Dn, 116 Up, 116A, 124 Dn, 124 Upii Renewal Of Guard Rails Flared Portion On Approaches Of Bridges- From Km. 1.028 To Km. 41.024 All Line Bridge No- 5A Main, 5A Up, 5A Dn, 35 A/L, 35 B/L, 35 Dn, 35 Up, 53 A/L, 53 B/L, 53 Dn, 53 Up, 116 Dn, 116 Up, 116A, 124 Dn, 124 Up.Iii Renewal Of Guard Rail Wider Sleeper 60 Kgiv Renewal Of Guard Rail Approach Sleepers
I- Ms-Vm Section : Through Sleeper Renewal S Of Existing 52Kg Sleepers With 60Kg /Psc/1540 Nos/Km - 5.334 Km - At Cgl Siding -1 Loop Line From 0. 00 Km - 0.432 Km, Cgl Siding - 2 Loop Line From 0. 00 Km - 0.549 Km, Tmv Road - 1 Loop Line From 0. 00 Km - 0.900 Km, Cgl Road -5 Loop Line From 0. 00 Km - 1.185 Km, Cgl Road -7 Loop Line From 0.00 Km - 1.262 Km & Cgl Road -8 Loop Line From 0. 00 Km - 1.006 Km; Ii-Ms - Vm Section : Through Fitting Renewal For A Length Of 33.125 Km From Km. 41.275 - 59.40 Down, Km. 0.00 - 5.00 Dn Sub, Km. 0.00 - 5.00 Up Sub, Km. 0.00 -5.00 Main. Iii-Ms-Vm Section- Trr S-3.26 Km, - Total - 0.43 Km With 60 Kg Cl.Ii Rails/Lwr, - Main Line - Cgl - Raod -4 From 0.00 Km - 0.43 Km & Total - 2.83 Km With 52 Kg Cl.Ii Rails/Lwr - Loop Line - Kgz Road -1 From 0.00 Km - 0.94 Km, Loop Line - Kgz Road -4 From 0.00 Km - 0.91 Km, Loop Line - Tzd- Road -4 From 0.00 Km - 0.98 Km.
Casual Renewal Of Rails, Sleeper, Fittings, Over Hauling & Miscellaneous Work In Yards In The Section Under Aden/Hnzm.
Godhra - Nagda Section :- Through Sleeper Renewal Tsrp 84.05 Tkm With Contractors Own Pqrs Portal With Other Ancillary Track Works.
Execution Of Through Sleeper Renewal For A Length Of 57.417Kms On Different Locations Of Khurda Road - Palasa Section Of Khurda Road Division.
Open E-Tender For The Work Of Different Type Of Track Activity Like Casual Renewal Of Rail-Sleeper-Switch-Sej-Fittings, Tamping Of Track, Deep Screening, Assisting Track Machine Etc With Other Ancillary Works In Malda Town-New Farakkaex Up & Dn/L Km -295/0-261/0 In The Section Of Sse/Pwi/Mldt Under Assistant Engineer/Mldt In The Jurisdiction Of Divisional Engineer/I/Eastern Railway/Malda.
Open E-Tender For The Work Of Different Type Of Track Activity Like Casual Renewal Of Rail-Sleeper-Switch-Sej-Fittings, Tamping Of Track, Deep Screening, Assisting Track Machine Etc With Other Ancillary Works In Bdlc-Barharwa-Karanpurato Double Lineup & Dn/L Km-172/200-215/200 And Tinpahar-Rajmahal 0/0-11/576 Single Line Section In The Section Of Sse/Pwi/Barharwa Under Assistant Engineer/New Farakka In The Jurisdiction Of Divisional Engineer/I/Eastern Railway/Malda.
Replacement Of Corroded And Perforated Flange Plates Of Cross Girders, Stringers, Deck Plates Etc. Plates And Changing Of Corroded And Workout Rivets Of Bridge No. 13ccr Span: 7x1x160.70m + 2x24.40m Along With Renewal Of Channel Sleeper By H-beam Sleeper.