Cleaning The Choked Up Ash In 300nb Dia Mserw Ash Slurry Disposal Pipe Line -1, 2 And 3 From Ash Slurry Disposal Pump House To Nap I And Ab Ash Pond As And When Required During The Year 2025 26
Ash Slurry Pipe Line Replacement Of Unit 5 From Plant Boundary Wall To Ash Pond Under Ahpmm Btps
Replacement Of Existing Eroded Ash Slurry Pipe Line Of 450nb Inside Outside Of Power House From Culvert To Ash Dyke Thrust Block At Ahp-ii, Ph-ii, 2x660 Mw, Sstpp, Mppgcl
Ktps-vii Stage-oandm-cam-dismantling Of 300nb Mserw Ash Slurry Disposal Pipe Line Of Ktps-vii Stage I.e., Line-3 From Ab Ash Pond Diverted Point To Northern Ash Pond-i Up To Nap-ii Diversion Point In The Year 2025-26
Replacement Of Existing Eroded Ash Slurry Pipe Line Of 450nb Inside Of Power House From Iron Bridge To Bridge Near Ash Tech Company Office At Ahp-ii, Ph-ii, 2x660 Mw, Sstpp, Mppgcl, Dongalia.
Replacement Of Existing Eroded Ash Slurry Pipe Line Of 450Nb Inside Outside Of Power House From Culvert To Ash Dyke Thrust Block At Ahp-Ii, Ph-Ii, 2X660 Mw, Sstpp, Mppgcl, Dongalia.
Replacement Of Existing Eroded Ash Slurry Pipe Line Of 450nb Inside Of Power House From Iron Bridge To Bridge Near Ash Tech Company Office At Ahp-ii, Ph-ii, 2x660 Mw, Sstpp, Mppgcl, Dongalia.
Rotation And Replacement Of Ash Slurry Discharge Pipe Line Of U 5.
Raising Of Rcc Pedestal For Ash Slurry Pipe Line Along Ash Dyke 1 Sipat
Nctps Isemii Circle Ahp Dn Unit I Eco Hopper Renewal Of Existing Eroded And Damaged Ash Slurry Disposal Ms Pipe Line With Cast Basalt Pipes And Fittings In Unit I During Available Shutdown