Construction Of Retaining Wall In The Spill Channel Of Podia Mip In Podia Block Of Malkangiri District Under Idf Scheme For The Year 2025-26. Construction Of Retaining Wall In The Spill Channel Of Podia Mip
Raising And Strengthening Of Right Embankment Of Flood Spill Channel At Gulabawari.
Construction Of Toe Protection Slope Protection Works On Inner And Outer Right Side Embankment Of Flood Spill Channel At Jawahar Nagar At Spots
Construction Of Gated Spill Way, Cofferdam, Diversion Channel And Canal Head Regulator Of Harharia Fis Under Pmksy Hkkp For The Year 2021-2022
Installation Of Separate 25 Kva Sub-station For Flood Spill Channel Division Narbal At Narbal Under Renovation/upgradation Of Existing Infrastructure At Narbal Irrss2022100317.
Restoration Of Spill Way Channel Protection Work On Parganlar At Rd 1060M.
Repair Of Various Flood Gates On Gogaldara Nallah And Flood Spill Channel Sub Division Singhpora
Removal Of Encroachments And Other Emergent Works In The Jurisdiction Of Flood Spill Channel Division Narbal During The Financial Year 2025 26
Construction Of 200m Long High Level Rcc Bridge With Approach Road Across Punasi Spill Channel
Construction Of 200m Long High Level Rcc Bridge With Approach Road Across Punasi Spill Channel