Supply Of Set Of 03 Springs For Master Controller
Retensioning Of Old Leaf Springs, Repairing, Mechanical, Welding And Electricals Works Of Shells At Yamuna Vihar W/E-I Under Ee C-7
Gem Bids For Spare, Obturating Ring, Lock Pin, Front Piston W Ring, Rear Pistonw Ring, Firing Pin Point, Current Supplying Contact, Contactor Assy, Gas Block, Valve, Nut, Locking Ring, Springs, Pawl, Breech Block Body, Breech Block, Firing Pinspring, Upper Crank, Connecting Rod, Lower Crank1, Packer
Supply Of Springs
Supply Of Springs
Supply Of Springs
"outsourcing The Work Of Phosphating Of Lhb Coach Coil Springs Of Fabrication Smithy Shop Through Private Agency On Open Tender For A Contract Period Of One Year In Ireps Portal"
Carriage Of Light Melting Scrap(lms) Items Consisting Of Wagon Body(in Dismantled/cut Conditions), Wagon Cbc Components Without Rubber(for Example Couplers And Draft Gears Without Pads), Wagon Bogies(in Dismantled Condition), Wagon End Buffers, Yoke, Knuckles, Springs(including Springs Used In Casnub Bogies), Ms Angles, Tie Bars, Ms Panel Sheet & Wagon Door, Ms Sheet, Scrap Ms Melting, Ms Adopter Wide Jaw And Narrow Jaw, Ms Cub Spacer, Ms Shearing Plate, Bogie Frame Bolster, Ms Plate, Ms Ingot And Others; From Various Railway Units In India To Rail Wheel Factory, Yelahanka, Bengaluru-560064; Distance:0-500kms (with A Minimum Chargeable Distance Of 100kms), By Road. Special Note: The Consignor Railway Authorities Shall Ensure That Cast Iron And/or Sulphur Embedded Items Are Not Offered For Loading. Note: The Work Involves Other Intermediary And Ancillary Activities Such As:(a)collection Of Lms (b)loading The Lms Into The Vehicle. The Contractor Shall Load Only Those Lms Items Which Are Free From Rubber Components Or Any Other Attachments(c)unloading At Destination, By Railways At Free Of Cost.quantity: 5500 Mt. Special Note: (1) Tenderers Should Quote The Rates Based On The Diesel Price Of Rs.90.99 Per Litre Prevailing At Bengaluru As On Estimation Date I.e., 03.10.2025 And The Same Shall Be Considered For The Purpose Of Evaluation. (2)mandatory Documents Should Be Submitted In Compliance Of: Bid Security Conditions Including Annexure Vi(a), Annexure-v, Annexure-v(a), Annexure-vi(b), Power Of Attorney And Iba Certification. (3) Non-submission Of Necessary Documents In Support Of The Above May Result In Rejection Of Bids.
Supply Of Set Of Primary Springs For Wag-7 Locos Outer And Inner
"stripping Of Icf/lhb Bogies, Overhauling Of Springs & Other Non-core Activities As Per Scope Of Work In Motibagh Workshop, Nagpur For 03 Months".