Supply Of S.s. Inlay Support Plate.
Buffing Along With Stripping, Fitting And Clamping Of Ss Wash Basin, Ss Wall Protector And Ss Lavatory Pan/Inlay In Icf, Memu & Lhb Coaches In Mechanical Workshop, Gorakhpur.
Supply Of Ss Lavatory Inlay For Western Style For Icf Ac And Non-ac Coaches.
Supply Of Unified Pressing Of Ss Lavatory Inlay For Pan With Stiffeners And Floor Drain Pipes Housing.
Supply Of Ss Lav Inlay For Lhb Ac Coaches Along With Supporting Structure For Pan L.h Consisting Of Item No. 1 & 3 Of Drg No. Llh - 34/2024. Warranty Period: 30 Months After The Date Of Delivery
Supply Of Ss Lav Inlay For Lhb Ac Coaches Along With Supporting Structure For Pan R.h Consisting Op Posite Of Item No. 1 & 3 Of Drg No. Llh - 34/2024. Warranty Period: 30 Months After The Date Of Delivery
Supply of Ss Commode Lavatory Inlay Assembly To Drg No.568 Sv/Dpc3/9-0-003, Col-Ii-1 N O. Special Condition : Suitable Packing To Be Done To Avoid Damage During Transit, Unloadin G And Rust Prevention During Storage. Warranty Period: 30 Months After The Date Of Delivery Quantity Tolerance +/-: 5 %Age, Item Category : Normal, Total Po Value Variation Permitted: Max 8 Lacs
Supply of Ss Lav Inlay For Lhb Ac Coaches.
Supply of Ss Lav Inlay For Lhb Ac Coaches.
Supply of Ss Lav Inlay For Lhb Ac Coaches Along With Supporting Structure For Pan L.H Consisting Of Item No. 1 & 3 Of Drg No. Llh - 34/2024. Warranty Period: 30 Months After The Date Of Delivery