Ohe Modification Work In Connection With "(a) Yard Remodeling Of Barharwa Station Along With Extension Line No.1 & 2 In Malda Division Of Eastern Railway, (b) Extension Of Stabling Line At Bgp End Of Shivnarayanpur Station To 750 Mts. Along With Connection To Main Line And Signalling Facility Of Malda Division Of Eastern Railway, (c) Provision Of Brake Van Siding & Engine Escape Line At Sakrigali Station, (d) Extension Of Jamalpur Dock Line To Accomodate 12 (twelve) Coach Memu Rake Of Malda Division Of Eastern Railway & (e) Conversion Of Line No. 4 Of Abhaipur Station Into Common Loop Of Malda Division".
"earthwork Filling And Construction Of Retaining Wall, Drain, P.way Works And Other Miscellaneous Work In Connection With Provision Of Five Full Length Stabling Line At Gorakhpur" & "provision Of Drain, Road, Boundary Wall, Building Work, P.way Works And Other Miscellaneous Works In Connection With Provision Of Construction Off Rob No. 157a Spl. At Gorakhpur Cantt. In Lucknow Division Of N.e. Railway."
Supply Of 12222 Cum Stone Ballast (machine Crushed) 65 Mm Gauge On Cess In Connection With Proposed Stabling Line Of Critical Rolling Stock (crs) At Satrod Yard Under Aden/ Ssa.
Design, Supply, Erection Testing And Commissioning Of 25 Kv, Single Phase, Ac Ohe Works In Connection With The Following Works : A.provision 2 Nos. Of Stabling Line 750m (up & Dn Loop) In Up Direction At Bsl End Of Devlali Station. B.provision Of C&w Examination And Stabling Facilities At Devalali Station Phase -ii. C.provision Of 2 Nos. Of Stabling Line Of Nashik Station. D.provision Of Extension Of Cop On Pf No. 2/3 Csmt End At Nashik Road Station. E.provision Of Cover Over Platform (cop) On Pf No. 4 At Nashik Road Station.
Design, Supply, Erection Testing And Commissioning Of 25 Kv, Single Phase, Ac Ohe Works In Connection With The Following Works : A)1 No. Of Stabling Line 700m In Dn Direction And 2 Nos. Of Stabling Line 600m In Up Direction At Bsl End Of Kherwadi Station. B)1 No. Of Stabling Line 750m In Dn Direction And 2 Nos. Of Stabling Line 750m In Up Direction At Bsl End Of Kasbesukene. C)provision Of At Supply To Ei Building In Connection With Revised Scope Of Odha Long Haul Work Kumbh-2027.
Jbp Division- Provision Of Full Ohe Wiring On Shunting Neck At Gar, A&d Siding At Bhtn And Stabling Line At Adtl.
Provision Of (1) All Weather Covered Peb (pre Engineered Building) Shed Over Inspection Pit And Stabling Line. & (2) Coach Repair Shed With Gantry For 25 T Eot Crane, In Connection With Development Of Examination And Maintenance Facilities For Nmg/nmgh/nmghs Rakes At Devlali.(pid-01.01.42.24.1.50.001)
Mys: Construction Of Rcc Box Drain Cum Compound Wall Along Railway Boundary Parallel To Stabling Line Upto Stp To Treat Sewage Water As Per Ngt Guidelines
1. Barlai - Additional Common Loop Line At In Connection Of Simhastha 2028. 2. Pingleshwar - Emergency X-over In Connection Of Simhasth-2028. 3. Tajpur - Additional Loop Line At In Connection Of Simhastha 2028. 4. Naikheri - Yard Remodeling With Additional Loop And Stabling Line In Connection Of Simhastha 2028.
Provision Of Additional Coaching Stabling Line With Coach Watering Facility At Bunder