Procurement Of Spares For Main Turbine Gland Steam Supply And Leak Off Valve Actuators In Unit I And Ii
Gem Bids For Stator Blades For Steam Turbine Of Turbo Blower 6Scope Of Supply: Complete Stator Blades For 5Th Ro, Stator Blades For Steam Turbine Of Turbo Blower6 Scope Of Supply: Complete Stator Blades For 6Thro
Work Of Overhauling Of Emergency Stop Valve Control Valve And Governing Valve Of Steam Turbine Of Ccpp Plants At Dhuvaran Gbps During Aoh Coh And On As When Required Basis For 18 Months.
Complete Overhauling Including Attending Of Minor Repair Works Of Bhel Make, 50Mva Stg Power Transformer Of Steam Turbine
Gem Bids For Custom Bid For Services - Engagement Of Expert Engineer For Over Hauling And Troubleshooting Of Bhel Make, Kwu Siemens Design Governing System Of 120 Mw Steam Turbine
Gem Bids For Annual, Bid Number Gem2025b6964167 Dated 05-12-2025 Bid Document1 30 0 0 Sr No 1Rotating Eqpts Motor Rating Up To 20Kw, Sr No2rotating Equipmnt Rating From 20 To 50Kw, Sr No3rotating Equipmnts Rating More Than 50Kw, Sr No4diesel Engine Power Rating Up To 500Kw, Sr No 5Feedgas Expander Or Feed Gas Compressor Power Rating5point2 Mw, Sr No 6Demethaniser O Or H Expander Orlean Gas Compressor Power Rating 5Point2 Mw, Sr No7lean Gas Compressors Power Rating 17 Mw Two Stage, Sr No 8Gas Turbine Power Rating 17Mw Make Siemens, Srno 9Residue Gas Compressor Power Rating 5Point7 Mwmake Bhel, Sr No 10Steam Turbine Power Rating5point7mw, Sr No 11Propane Refrigerantcompressor Power Rating 15 Mw, Sr No 12Staemturbine Power Rating 15Mw Make Elliot Ebara, Sr No13cooling Water Pump Rating 1360 Kw, Sr No14cooling Water Pump Steam Turbine Driven Rating 1360Kw, Sr No 15Steam Turbibe Generator Packagerating 15 Mw Captive Power Make Siemens, Sr No16vibration Monitoring Of Various Pipeline, Sr No17rotating Eqpts Motor Rating Up To 20Kw, Sr No18rotating Equipmnt Rating From 20 To 50Kw, Sr No19rotating Equipmnts Rating More Than 50Kw, Sr No20diesel Engine Power Rating Up To 500Kw, Sr No21expander Compressor Power Rating 4Mw, Sr No22reciprocating Pump Or Comp Rating Upto 50Kw, Sr No23reciprocating Pump Or Comp Rating More 50Kw, Sr No24ge Frame 3 Gt And Equipments Rating 7 Mw, Sr No25centrifugal Compressor Power Rating 7Mw, Sr No 26Geframe 1 Gt And Equipments Rating 3Mw, Sr No27centrifugal Compressor Power Rating 3Mw, Sr No28dynamic In Situ Balancing Of Rotors, Sr No 29Vibrationmonitoring Of Various Pipeline, Sr No 30Vibrationmonitoring Transient Analysis, Sr No 31Aeroderivative Gtrating 2Point6 To 2Point9mw, Sr No 32Centrifugal Comprating 2Point6 To 2Point9mw, Sr No 33Aeroderivative Gtrating 2Point9mw, Sr No 34Electric Generator Power Rating2point7 Mw, Sr No 35Rotating Eqpts Motor Rating Up To20kw, Sr No 36Rotating Equipmnt Rating From 20 To 50Kw, Sr No 37Rotating Equipmnts Rating More Than 50Kw, Srno 38Diesel Engine Power Rating Up To 50Kw, Sr No39diesel Engine Rating From 50 To 500Kw, Sr No 40Dieselengine Rating From 500 To 1500Kw, Sr No 41Reciprocatingpump Or Comp Rating Upto 50Kw, Sr No 42Reciprocatingpump Or Comp Rating More 50Kw, Sr No 43Solar Gt Andequipments Power Rating 9 Mw, Sr No 44Compressorcentrifugal Power Rated 9Mw, Sr No 45Rb211gas Turbinerating 23 Mw, Sr No 46Compressor Centrifugal Rating20point5 Mw
Gem Bids For Hp Inlet Nozzle Blades Of Turbine (1 Set Equal 35 Pcs),turbine Type/model No- Enhk/32/36/64-3 (machine Serial No-t-0411r & T-0412r) , Initial P O No. -1051/u/p /1006/520/icb/001/pdwr/mm Dated-06/07/1994, Revamp P.o No, Pnmm/1073/p/ 520/icb, Dated- 28th May,technical Requirements- 1073(u)-pnmc-tr-520, Rev 2, Co2 Compressor Turbine Data Sheet- 1073 (u)-pnmc-dd-tk-520, Rev 2, Drawing & Documentation Schedule For Steam Turbine- 1073(u)-pnmc-dds-tk-520,rev 2. Lp Inlet Nozzle Blades Of Turbine(1 Set Equal 35 Pcs),turbine Type/model No- Enhk/32/36/64-3 (machine Serial No-t-0411r & T-0412r), Initial P O No. - 1051/u/p/1006/ 520/ Icb/001/ Pdwr/ Mm Dated 06/07/1994, Revamp P.o No, Pnmm/1073/ P/520/icb,dated- 28th May,technical Requirements- 1073(u)-pnmc-tr-520, Rev 2, Co2 Compressor Turbine Data Sheet- 1073(u)-pnmc-dd-tk-520, Rev 2, Drawing & Documentation Schedule For Steam Turbine- 1073(u)-pnmc-dds-tk-520, Rev 2. Hp Valve Yoke Assembly Including Valve Cones, Turbine Type/model No- Enhk/32/36/64-3(machine Serial No-t-0411r And T-0412r) , Initial P O No. -1051/u/ P/1006/520/ Icb/001/pdwr/ Mm Dated-06/07/1994, Revamp P.o No, Pnmm/1073/p/ 520/icb, Dated- 28th May, Technical Requirements- 1073(u)-pnmc-tr-520, Rev 2, Co2 Compressor Turbine Data Sheet- 1073(u)-pnmc-dd-tk-520, Rev 2, Drawing & Documentation Schedule For Steam Turbine- 1073(u)-pnmc-dds-tk-520, Rev 2. Lp Valve Yoke Assembly Including Valve Cones, Turbine Type/model No- Enhk/32/36/64-3(machine Serial No-t-0411r & T-0412r), Initial P O No. -1051/u/p/1006/ 520/ Icb/001/pdwr/ Mm Dated-06/07/1994, Revamp P.o No, Pnmm/1073/ P/520/icb, Dated- 28th May, Technical Requirements-1073(u)-pnmc-tr-520, Rev 2, Co2 Compressor Turbine Data Sheet- 1073(u)-pnmc-dd-tk-520, Rev 2, Drawing & Documentation Schedule For Steam Turbine- 1073(u)-pnmc-dds-tk-520, Rev 2. L-rings With Thread Bush &pin For Hp Steam Chamber (1set Equal 4nos), Turbine Type/model No- Enhk/32/36/64-3(machine Serial No-t-0411r & T-0412r) , Initial P O No. -1051/u/p/ 1006/520/icb/001/pdwr/mm Dated- 06/07/1994, Revamp P.o No, Pnmm/1073/p/520/icb,dated- 28th May, Technical Requirements-1073(u)-pnmc-tr-520, Rev 2, Co2 Compressor Turbine Data Sheet- 1073(u)-pnmc-dd-tk-520, Rev 2,drawing & Documentation Schedule For Steam Turbine-1073(u)-pnmc-dds-tk-520,rev 2.
Ttps Mech Ii Tm Ii Kwu Turbine Capital Overhaul Of 210 Mw Kwu Design Steam Turbine And Generator Set And Rla Study On Turbine Components In Unit V
Supply Erection Commissioning And Testing Of Constant Load Hangers Type 2610 167 For Turbine Hp Lp Bypass Steam Line In Unit I
Contract For Hydro Jet Cleaning Of Condenser Tubes Of Steam Turbine Whru At Gas Turbine Power Station Gtps As Per Tender Documents Contract For Hydro Jet Cleaning Of Condenser Tubes Of Steam Turbine Whru At Gas Turbine Power Station Gtps